Resurfacing and Rehabilitation of Runway 15-33 - 5 Wing Goose Bay

The Department of National Defence (DND) has proposed a project. The rehabilitation of Runway 15-33 will be completed by 2025 and will involve milling and replacing the existing asphalt over the entire runway surface. The work will involve milling to a thickness of 80 millimeters for the entire area of Runway 15-33. The total estimated quantity of asphalt would be 32,520 tonnes and the estimated quantity of millings to be stockpiled on site would be 13,550. Once the milling is complete, new asphalt will be over-layed on the surface with a thickness of approximately 100 millimeters.


Latest update

May 11, 2023— The Department of National Defence issued its Notice of Determination and determined that the project is not likely to cause significant adverse environmental effects.

.

Participate

Key documents

Key documents
Document Number Document Title File Date
2 Notice of Determination - May 11, 2023
1 Public Comment Period on Intent to Make a Determination - February 8, 2023

Contacts

Garrett Sykes
Department of National Defence
Garrett Sykes, Officer Commanding
5 Wing Goose Bay
Happy Valley-Goose Bay, Newfoundland and Labrador A0P 1S0
Email: garrett.sykes@forces.gc.ca


  • Location

    • 5 Wing Goose Bay (Newfoundland and Labrador)
  • Nature of Activity

    • Airport and Airfields
  • Assessment Status

    Completed
  • Start Date

    2023-02-08
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    84315
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: