Ginoogaming KM 132 Bridge Replacement
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
Replacement of the Bridge located on Caltonite known as km 132 bridge in Ginoogaming First Nation. The riparian zone within the nearby vicinity of the bridge consists of gravel and sand with sparse vegetation directly beside the bridge. As you move upstream and downstream of the bridge the riparian area consists of mainly grasses and shrubs, likely due to the fluctuating water levels that are present seasonally. Further upland the riparian area is dominated by dense mixedwood forest. Conditions typical of boreal zones within northwestern Ontario were noted throughout the bridge vicinity. A predominance of coniferous and mixed-wood forest stands that include main conifer species such as black and white spruce, jack pine, balsam fir, eastern white cedar, and white birch were noted on the high ground. Shrubs such as alder, willow, moose maple and grasses and sedges were noted on the low ground. The replacement of this bridge structure should not impact terrestrial wildlife or their habitat. No issues or concerns are expected given that no evidence of wildlife using this structure was noted and it does not represent specialized or suitable habitat for terrestrial wildlife. There will be minimal work in-water or disturbance to the natural streambed. The only work in-water will be the removal of 18 wooden piles which will be cut off just above the streambed to avoid any disturbance to the natural stream channel. Turbidity curtains will be installed to contain any sediment that is disturbed during pile removal activities. The Making Ground River flows northerly for 8.6km from the bridge crossing and enters Long Lake just south of the Town of Longlac. The river is approximately 16m wide at the bridge which is consistent with the natural stream width upstream of the bridge. Beginning approximately 750m downstream of the bridge the river becomes 50-70m wide. The morphology of the river at the bridge crossing location would be described as a slow-moving run. The water depth under the bridge was 1.4m at the time of assessment (Fall). There was evidence that the average high water level is approximately 1m higher than the current water level at the time of assessment. The substrate of the river was variable with some areas having cobble/boulder while other areas had sand, silt, muck and organic material. The streambed around the eastern abutment, particularly on the southeast corner had abundant cobble present. The area around the western abutment directly under the bridge has soft substrates of silt and sand. On the northwest corner there is some coarse gravel and occasional cobble present. The southwest corner is comprised of predominately sand that has been deposited through natural processes. The middle of the stream under the bridge has soft substrates of silt and sand. The fish habitat under the bridge does not appear to be critical or significant for fish. The habitat would be used for migration and possibly feeding and cover. Upstream (south) of the bridge there is predominant cobble substrates beginning approximately 10m south. This habitat has the potential to be used for spawning by walleye or white sucker though the usage of this habitat for spawning can not be confirmed at this time. There is habitat with similar potential to be used for spawning habitat located 40-80m downstream (north) of the bridge.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | Public Comment Period on the Intent to Make a Determination | - | August 23, 2023 |
Contacts
Indigenous Services CanadaAaron Pervais, Environmental Officer
101-100 Anemki Place Fort William First Nation
Thunder Bay, Ontario P7J 1A5
Telephone: 807-358-1802
Email: aaron.pervais2@sac-isc.gc.ca
-
Location
- Ginoogaming KM 132 Bridge (Ontario)
-
Nature of Activity
- Bridges
-
Assessment Status
In progress -
Start Date
2023-08-23 -
Proponent
Ginoogaming First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
85862
Nearby assessments
...within 200 kilometres-
Kiashke Zaaging Anishinaabek - Small Scale Waste Transfer Design and Construction
Kiashke Zaaging Anishinaabek (Gull Bay) First Nation -
Gull Bay Roads Rehabilitation
Neebing -
Gull Bay First Nation Diesel Generating Station Upgrade
Kiashke Zaaging Anishinabe -
Gull Bay Lagoon Expansion ICIP 57532
Gull Bay Lagoon Expansion-Gull Bay First Nation -
Whitesand Elder's Unit (6-Plex)
Whitesand First Nation -
Stormwater Management (SWM) Infrastructure Remediation
Armstrong -
Rehabilitation of the Whitefish Bay Water Distribution System
Project Area -
Range and Training Area - Thunder Bay Region
Upsala -
The BNA Three Phase Transmission Project
The BNA Three Phase Transmission Project -
Bingwi Neyaashi Anishinaabek (196) Lot Servicing and Pre-Construction
Bingwi Neyaashi Anishinaabek -
The BNA Road Access Project
Bingwi Neyaashi Anishinaabek -
Lac Des Mille Lac First Nation Residential Sub Division
Lac Des Mille Lac First Nation -
Ojibway Nation of Saugeen Fibre Construction
Ojibway Nation of Saugeen -
Lake Superior National Marine Conservation Area Discovery Centre
Lake Superior National Marine Conservation Area -
Replacement of the Superior West Weather Radar
Shuniah, ON -
Thunder Bay (Current River) Harbour Rehabilitation
Thunder Bay -
Environmental Remedial Work at the former Fire Training Area at the Thunder Bay Airport
Thunder Bay -
Mishkeegogamang Ojibway Nation Broadband Tower Construction
203 Mishkeegogamang -
AZA Roadway Granular Procurement and Design-Build Construction
Animbiigoo Zaagi'igan Anishinaabek -
Hammond Reef Gold Mine Project, Mitta Lake, Atikokan
Mitta Lake -
Pays Plat New Housing Units
Pays Plat -
New Osnaburgh Water Treatment Plant Upgrades
New Osnaburgh -
Sachigo Lake First Nation Water Treatment Project
Sachigo Lake First Nation -
Hardrock Deposit Project
Geraldton -
Pigeon River Drilled Well Groundwater Supply
CBSA Pigeon River -
The Elders Lodge at Aroland First Nation
Aroland Elder's Lodge -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Hudson Tower -
Bending Lake Iron Project
49 kilometres southwest of Ignace -
Frenchman's Head Sewage Treatment Plant and Collection System (Lac Seul)
Frenchman's Head (Lac Seul) -
New (Multiple) Tower Construction, Upgrade (Multiple) Towers, New Fibre Installation (Keewaytinook Okimakanak (Knet))
Frenchman's Head Tower #2