Dumper 2 Potash Replacement Project

The proposed project 

Neptune Bulk Terminals (Canada) Ltd. (NBT) is proposing to replace one of two existing potash rail dumper receiving and conveyor systems located at the south east corner of their terminal (immediately north of Berth 3). Potash Dumper No. 2 is reaching the end of its service life and requires a replacement that will match the increased? dumper capacity (6000 metric tonnes per hour from 4000 metric tonnes per hour) as Potash Dumper No. 1, which was refurbished in 2010. As part of the project, the dumper hopper is to be extended approximately 6 metres towards the north east for positioning and unloading of up to 3 rail cars at a time. Overall terminal throughput is not anticipated to increase as a result of the project and there is no anticipated change in rail or vessel traffic. The total land-based? footprint includes an area of approximately 2000 square metres with the majority of the excavation to a depth of 7 metres and up to a depth of 12 metres. 

Work is anticipated to commence Q1/Q2 of 2024 and is expected to occur over a period of approximately 10-15 months.?? 


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

June 16, 2022 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Dumper 2 Potash Replacement Project, located at Neptune Bulk Terminals (Canada) Ltd. 1001 Low Level Road, North Vancouver, BC are likely to cause significant adverse environmental effects. Written comments to be received by July 15, 2022. .

Key documents

Key documents
Document Number Document Title File Date
1 Dumper 2 Potash Replacement Project - Public comments invited - June 16, 2022

List all records

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Dumper 2 Potash Replacement Project (British Columbia)
  • Nature of Activity

    • Ports and Harbours
    • Mines and Minerals
  • Assessment Status

    In progress
  • Start Date

    2022-06-16
  • Proponent

    Neptune Bulk Terminals (Canada) Ltd. (NBT)
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    83717