Fox Lake Cree Nation Water and Sewer System Development Project
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
The project includes upgrades to the existing water and wastewater systems to provide water treatment and distribution, and wastewater collection and treatment in the community for the next 20 years. The upgrades will consist of water treatment plant upgrades (WTP), sewage lift station upgrades, water distribution system upgrades, wastewater collection system upgrades, decommissioning of the existing wastewater treatment plant (WWTP), a new raw water supply line, and a new wastewater forcemain that extends to a new off-reserve aerated lagoon and SAGR system.
Infrastructure:
Water Treatment Plant
The community's existing water treatment system will be upgraded to restore the WTP to its intended design function. The upgrades will include repairs to the treated water storage reservoir, repair/replacement of the plant's electrical and controls systems, repair/replacement of process mechanical equipment, and repairs to the building's interior and exterior.
Wastewater Treatment Plant
The community's existing wastewater treatment system will be decommissioned. It will be replaced by a new, off-reserve sewage lagoon. Wastewater currently being pumped to the WWTP will instead be directed to the new lagoon. The wastewater treatment plant will be removed and the existing sewage outfall will no longer be used.
Lift Stations
There are two lift stations that operate as part of the gravity wastewater collection system in the community. One main lift station and one that services the school. Upgrades to the main lift station will include building repairs, mechanical process equipment replacement, and repairs/replacement of electrical and control systems, including instrumentation.
Raw Water Supply Line
An approximately 4,000 m new raw water supply line will be required to replace the existing line. Most of the line will be off-reserve but also consists of about 750 m that runs on-reserve. The purpose of the line will be to supply the WTP with raw water to treat and distribute to the community.
Forcemain
A new forcemain will be required to convey wastewater from the community to the new off-reserve treatment facility. It will run from the existing main community lift station to the new lagoon.
Water Distribution System
The existing water distribution system will be repaired to restore proper operation of the network. This may include swabbing and flushing of the watermain, repairing/replacing mainline isolation valves, repairing/replacing heat-trace as needed, and repairing any noted leaks in the system.
Gravity Wastewater Collection System
The existing gravity wastewater collection system will be repaired to restore proper operation of the network. This may include mainline flushing, manhole cleaning, a closed-circuit television (CCTV) inspection, repairing/replacing manhole frost covers, and repairing waterproof coating on the manholes to reduce infiltration.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
2 | Notice of Determination for the Fox Lake Cree Nation Water and Sewer System Development Project | - | March 14, 2023 |
1 | Public Comment Period on Intent to Make a Determination | - | April 21, 2022 |
Contacts
Indigenous Services CanadaAngela Bidinosti, Senior Environmental Officer
200-365 Hargrave Street
Winnipeg, Manitoba R3B 3A3
Telephone: 204-984-0964
Fax: 204-983-2936
Email: angela.bidinosti@canada.ca
-
Location
- Fox Lake Cree Nation (Manitoba)
-
Nature of Activity
- Water Management
-
Assessment Status
Completed -
Start Date
2022-06-01 -
Proponent
Fox Lake Cree Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
83551
Nearby assessments
...within 200 kilometres-
Community Resource Centre
Bird -
Keeyask Generation Project
Gull Rapids -
War Lake First Nation Moosenose Lake Dam
Moosenose Lake Dam Reinforcement -
Tataskweyak Cree Nation Environmental Remedial Actions at the Former Federal School Site
Tataskweyak Cree Nation Split Lake 171 -
Tataskweyak Cree Nation - Water Treatment Plant Upgrade
Tataskweyak Cree Nation -
Tataskweyak Cree Nation New Commercial Parcel Utility Development
Tataskweyak Cree Nation -
Tataskweyak Cree Nation New Co-op Store
Tataskweyak Cree Nation -
York Factory First Nation Remedial Actions Project
York Factory First Nation -
Shamattawa 30 Unit Housing Subdivision 2122
Shamattawa First Nation -
Shamattawa Water treatment plant
Shamattawa Water Treatment Plant -
York Factory First Nation Remedial Actions Project
York Factory First Nation -
Project 6 — All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation
East of Lake Winnipeg -
Remediation of Former Band Tank Farm Site
Manto Sipi Cree Nation -
Project 6 - All-Season Road Linking Manto Sipi Cree Nation, Bunibonibee Cree Nation and God's Lake First Nation