Connecting Pipelines Project - Canadian Forces Base (CFB) Suffield

International Petroleum Corp. IPC Canada Ltd is proposing to install pipelines to 4 producing oil wells within Canadian Forces Base (CFB) Suffield, approximately 55 kilometers from Medicine Hat, AB. All wells are currently producing to single well batteries (SWB). Installing pipelines will increase the efficiency of operations by eliminating trucking and product transfer, while reducing emissions. Approximately 5 kilometers of new right-of-way (ROW) with a width of 15 meters will be required for the installation of the pipelines. The ROW's will be reclaimed once construction is complete and surrendered upon exhaustion of the productive life of the associated wells.


Latest update

November 6, 2021 – The public comment period on the project is closed. The Department of National Defence is considering comments received to help inform its determination on whether the carrying out of the project is likely to cause significant adverse environmental effects.

Participate

Contacts

Danny Laganiere
Department of National Defence
Danny Laganiere, Base Environmental Officer, CFB Suffield
CFB Suffield, Post Office Box 6000 Station Main
Medicine Hat, Alberta T1A 8K8
Email: Danny.Laganiere@forces.gc.ca

IPC Canada Ltd.
Email: regulatory.ca@international-petroleum.com


  • Location

    • Canadian Forces Base (CFB) Suffield (Alberta)
  • Nature of Activity

    • Oil and Gas
  • Assessment Status

    Terminated
  • Proponent

    International Petroleum Corp. Canada Ltd.
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project on federal lands
  • Reference Number

    83103
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: