Bearskin Lake - Flood Emergency, Road Repair Assessment and Design - Moose River and Riverside Creek - Public Comments Invited
This is a non-designated project on federal lands or outside Canada. The listed authorities are responsible for the project assessment.
In November 2019, Bearskin Lake First Nation (BLFN) experienced a rare flood emergency in the community. Ice jamming at White Sands Rapids to the east of the community caused Michikan Lake levels to rise significantly resulting in damage to roads within the community. The damage restricted movements within the community and resulted in a state of emergency requiring evacuations that lasted approximately three weeks. The structural integrity of the roads and crossings were significantly impacted. Multiple areas were affected. Two (2) of the affected areas are described within this Project, as follows:
1) Moose River Crossing – During the flood event one culvert washed out and a substantial amount of material eroded from the road bed. The culvert was replaced and temporary repairs were made which enabled the crossing to accommodate a single lane of traffic. The affected area is approximately 225 m long. Required work at this location includes raising the road surface elevation to 226.5 m by placement of local gravel fill followed by appropriate granular material (granular A, granular M) for road topping. Additionally, a geotextile and rip rap protection will be placed around the two existing culverts to protect against future erosion.
2) Riverside Creek Crossing – During the flood event the road was overtopped at this creek crossing. As an emergency measure a 230 m segment of the roadway was temporarily built up to accommodate traffic. Required work at this location includes permanent raising the road surface elevation to 226.5 m by placement of local gravel fill followed by appropriate granular material (granular A, granular M) for road topping. Additionally, the two existing culverts (500 mm and 750 mm diameter) will be removed and replaced with two new 1,000 mm diameter CSP culverts. A synthetic liner and rip rap protection will be placed around the new culverts to protect against future erosion.
While the proposed work can be completed in accordance with the Fisheries Act and therefore it is unlikely that Authorization will be required by DFO, a Request for Review will be submitted as work will occur near or below the ordinary high water mark.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Participate
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
3 | Notice of Determination for the Bearskin Lake - Flood Emergency, Road Repair Assessment and Design - Moose River and Riverside Creek | - | May 10, 2021 |
2 | Public Comment Period on Intent to Make a Determination | - | January 7, 2021 |
Contacts
Indigenous Services Canada - OntarioJulieta Werner, Sr. Environment Officer
100 Anemki Place, Suite 101
Fort William First Nation, Ontario P7J 1A5
Telephone: 807-355-1196
Email: julieta.werner@canada.ca
-
Location
- Bearskin Lake First Nation (Ontario)
- Bearskin Lake First Nation (Ontario)
-
Nature of Activity
- Highways and Roads
-
Assessment Status
Completed -
Start Date
2021-01-07 -
Proponent
Bearskin Lake First Nation -
Authorities
- Indigenous Services Canada
-
Assessment Type
Project on federal lands -
Reference Number
81271
Nearby assessments
...within 200 kilometres-
Bearskin Lake - Flood Emergency, Road Assessment and Design - Mahan Bridge
Bearskin Lake First Nation -
Bearskin Lake First Nation - Lot Servicing for Housing Development
Bearskin Lake First Nation -
Sachigo Lake First Nation Wastewater Treatment Project
Sachigo Lake First Nation -
Muskrat Dam - Reverend Tommy Beardy Memorial Family Treatment Centre Remediation
Muskrat Dam First Nation -
New Fibre Installation / Upgrade Multiple Towers
Kingfisher Lake PoP -
New Fibre Installation / Upgrade Multiple Towers
Cat Lake Wireless Tower -
Sachigo Lake First Nation - Lot Servicing for future houses
Sachigo Lake First Nation -
Wapekeka First Nation New School Project
Wapekeka First Nation -
New Fibre Installation / Upgrade Multiple Towers
Pikangikum PoP -
North Caribou Lake First Nation School
North Caribou Lake First Nation -
North Caribou Lake First Nation - Lot Servicing for Housing Development
North Caribou Lake First Nation -
North Caribou Lake First Nation - Teacherages Project
North Caribou Lake -
New Fibre Installation / Upgrade Multiple Towers
Sachigo Lake PoP -
North Caribou Lake First Nation Water Treatment System Upgrades
North Caribou Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wawakepewin PoP -
New Fibre Installation / Upgrade Multiple Towers
Cat Lake PoP -
Kingfisher Lake First Nation K4-10 School
Kingfisher Lake First Nation/Reserve No. 1 -
Kingfisher Lake First Nation Subdivision Phase 2
Kingfisher Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Pikangikum Fibre Cabinet -
New Fibre Installation / Upgrade Multiple Towers
Poplar Hill PoP -
Keewaywin First Nation New Landfill Construction and Old Landfill Decommissioning Project
Kee-Way-Win First Nation -
New Fibre Installation / Upgrade Multiple Towers
Sandy Lake PoP -
Wunnumin Lake First Nation Teacherages Project
Wunnumin Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Wapekeka (Angling Lake) PoP -
New Fibre Installation / Upgrade Multiple Towers
Big Trout Lake PoP -
Wunnumin H1RCI Compound Construction
Wunnumin Lake -
Kasabonika Lake New 7 - 12 school
Kasabonika Lake First Nation -
Kasabonika Lake First Nation Band Representative Facility
Kasabonika Lake First Nation -
Red Sucker Lake New School and Servicing
Red Sucker Lake First Nation New School and Services -
Red Sucker Lake First Nation New Landfill
Red Sucker Lake -
Red Sucker Lake First Nation New Aerated Lagoon
Red Sucker Lake First Nation -
Sandy Lake Cultural Area
Sandy Lake -
Sandy Lake First Nation - Child and Family Services Building
Sandy Lake First Nation -
New Fibre Installation / Upgrade Multiple Towers
Muskrat Dam PoP -
New Fibre Installation / Upgrade Multiple Towers
Slate Falls PoP -
New Fibre Installation / Upgrade Multiple Towers
Bearskin Lake PoP