Trans Mountain Pipeline Fiddle River Hazard Remediation
This project entails a combination of two undertakings, including constructing a berm on and from the deposited gravels in the old gravel pit and armouring the 24-inch pipeline right-of-way at the overflow. In order to construct the berm, the flow of water entering the old gravel pit will be diverted into the adjacent active channel of the Fiddle River. Two rows of gravel filled mega bags will be placed via helicopter in the channel presently flowing in the old gravel pit. Armouring of the pipeline right-of-way may entail dewatering of the right-of-way area. If overflow is still occurring in the work area at the time of construction, a dam will be used to restrict flow into the work area and water will be pumped around the site. A fish salvage will be undertaken from the local pool of water at the right-of-way. Access for the construction of the berm will be downstream of the Highway 16 bridge on the Fiddle River and west towards the northeast to the gravel pit along the old access to the pit. Access to the work area for armouring of the pipeline will be via the existing right-of-of way from the west.
Disclaimer
This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.
Latest update
Key documents
Document Number | Document Title | File | Date |
---|---|---|---|
1 | New project being assessed by Parks Canada and Fisheries and Oceans Canada - Public comments invited from 21 December 2020 to 20 January 2021 | - | December 21, 2020 |
List all records
Contacts
Jasper National ParkBox 10
Jasper, Alberta T0E 1E0
Telephone: 780-852-6141
Email: pc.evaluationdimpactjasper-jasperimpactassessment.pc@canada.ca
-
Location
- Jasper National Park (Alberta)
-
Project Type
- Remediation and conservation
-
Status
In progress -
Start Date
2020-12-21 -
Proponent
Parks Canada -
Authorities
- Fisheries and Oceans Canada
- Parks Canada Agency
-
Assessment Type
Project on federal lands -
Reference Number
81251
Nearby projects
..within 200 kilometres-
Coalspur Vista Coal Mine Phase II Expansion Project
3.5 kilometres east of Hinton -
Coalspur Vista Coal Underground Mine and Expansion Activities Project
10 kilometres east of Hinton -
ATCO Miette 5L215 Rebuild
Jasper National Park -
Cascade Power Plant Project
Yellowhead County -
Highway 947 Extension Project
Edson -
Robb Trend Coal Mine Expansion Project
Robb -
JTA - Hochimini Trail Realignment
Jasper National Park -
Trail 1a Jasper National Park
Jasper National Park -
Parks Canada Agency - Trail 8c Re-route in Jasper National Park
Jasper National Park -
Evelyn Creek trail re-adoption into official trail network
Jasper National Park -
Highway 947 Extension Project
-
Pyramid Lake Resort Wastewater Treatment Plant and Disposal System
Jasper National Park -
Edson Mainline Expansion Project
Drayton Valley -
Alexis Nakota Sioux Nation 1993 Spill Remediation Project
Alexis Nakota Sioux Nation -
Edson Mainline Expansion Project
Drayton Valley -
Highway 93 N 2020 Rip Rap Sourcing Program
Banff National Park -
Prairie Lights Power Project
Greenview -
Alexandra Patrol Cabin Demolition and Removal
Banff National Park -
Sunchild Gas Distribution Line
Sunchild -
Owen Creek Warden Cabin Decommissioning
Banff National Park -
Edson Mainline Expansion Project
Rocky Mountain House -
NOVA Gas Transmission Ltd. - 2021 NGTL System Expansion Project
Grande Prairie -
Sundance 7 Generating Station Project
Wabamun