Power Plant and Distribution System, Op IMPACT, Ali Al-Salem Air Base, Kuwait

The Canadian Task Force on Op IMPACT in Kuwait will construct a new centralized power plant. This will include the construction of a new reinforced concrete pad with a berm, installation of two one mega-watt generators, the construct of two sun shades and a new Power Distribution Unit (PDU) concrete pad with a cable pit. This project will also include the purchase and installation of four (4) main conductor runs required to interconnect the Camp's main Power Distribution Unit (PDU) to the Camp's Secondary Distribution Units (SDUs).


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

November 18, 2020 - The Department of National Defence intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, the Department of National Defence is inviting public comments until December 8, 2020 respecting that determination.

List all records

Contacts

Environmental Engineer, Canadian Joint Operations Command
Department of National Defence
Shawn Burdett, Environmental Engineer, Canadian Joint Operations Command
Canadian Joint Operations Command
101 Colonel By Drive
Ottawa, ON K1A 0K2
Email: Shawn.Burdett@forces.gc.ca


  • Location

    • Ali Al-Salem Air Base, Kuwait (Outside Canada)
  • Project Type

    • Building and Property Development
    • Defense and Security
  • Status

    In progress
  • Start Date

    2020-11-18
  • Proponent

    Department of National Defence
  • Authorities

    • Department of National Defence
  • Assessment Type

    Project outside of Canada
  • Reference Number

    81157