Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner

Fraser Grain Terminal Ltd. (the Permit Holder) proposes to amend the scope of works approved under project permit PER No. 15-041 to include the installation of a grain cleaner as part of the Fraser Grain Terminal facility.

The proposed works would include the installation of an enclosed cleaning system comprising cleaning machines and a dust control system to minimize fugitive dust emissions. The machines would be supported by a three-level, steel support structure, with a concrete foundation, walkways, and stair/ladder access. The structure would be lower than the height of the adjacent grain silos, and would be enclosed on two sides to provide weather protection and noise attenuation. Also proposed, and integrated with the cleaning system, are two 4,200 cubic foot screening storage bins, three cleaner baghouses, an enclosed conveyance system, a loading spout and a single storey Modular Control Centre (MCC) building to hold new switchgear. An additional switching station module and transformer for high voltage power would also be installed.

The works would be located on the eastern side of the grain silos, adjacent to silos BN12 and BN14. The cleaning system would allow for the removal of dust, oversized or un-threshed grains, and other agricultural products (example chaff, leaves, pods, etcetera from wheat, canola, and peas) from the grain. The primary hours of operation would be 12 hours a day (overnight), 7 days a week, though cleaning may also take place during daytime hours on weekdays and weekends, should commercial and seasonal conditions require. Construction and commissioning works for Fraser Grain Terminal are ongoing, though nearing completion; these works are proposed to commence in the winter of 2020/2021 and complete in early summer 2021.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

November 18, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Fraser Grain Terminal – Grain Export Facility – Amendment 06 – Grain Cleaner, located at Fraser Grain Terminal, Surrey, B.C., is likely to cause significant adverse environmental effects. Written comments to be received by December 17, 2020..

List all records

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, BC V6C 3T4
Email: per@portvancouver.com


  • Location

    • Fraser Grain Terminal - Grain Export Facility - Amendment 06 - Grain Cleaner (British Columbia)
  • Project Type

    • Building and Property Development
    • Ports and Harbours
  • Status

    In progress
  • Start Date

    2020-11-18
  • Proponent

    Fraser Grain Terminal Ltd.
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    81153