Chipewyan Prairie First Nation Wastewater Treatment Plant Expansion

This project includes the construction of a new facultative (conventional) sewage lagoon, new sewage pumping station and new sewage force main for the community.  The purpose of this project is to replace the existing sewage treatment and collection / pumping infrastructure as the existing infrastructure is undersized, does not meet operational standards, and is located adjacent to the community, within the recommended minimum setback distance which poses a health and safety risk.

The new lagoon upgrades will include construction of four (4) new HDPE-lined lagoon cells: two (2) new 2,000 cubic metre anaerobic cells, one (1) new 19,035 cubic metre primary (treatment) cell, and one (1) new 92,785 cubic metre storage cell.  Overall the projected lifespan of the new lagoon is a minimum of 20 years.  The existing lagoon and related infrastructure will be decommissioned as part of the project, including removal of existing wastewater, leveling and backfilling and site decommissioning to Alberta standards.

The project will also include construction of a new primary sewage pumping station complete with wet / dry style substructure and a timber framed building for housing of all controls and a backup power generator.  New building size is approximately 67 square metres.  The projected life span of the new pumping station is a minimum of 20 years.  The sewage pumping station will be constructed adjacent to the existing primary, submersible wet well style station for the community.  The existing station will be decommissioned including removal of all mechanical and electrical equipment, demolishing the existing barrel to below grade, backfill and site grading.  The new sewage force main from the pumping station to the lagoon will be approximately 3,200 metres of 150 mm diameter HDPE piping.  A new 1,100 metre long access road is also required to access the new lagoon site from the existing roadways.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

November 10, 2020 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments until December 10, 2020 respecting the determination.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - November 10, 2020

List all records

Contacts

Indigenous Services Canada
Stacey LeBlanc, Sr. Environment Officer
630 Canada Place, 9700 Jasper Ave
Edmonton, AB T5J 4G2
Telephone: 780-782-8350
Email: stacey.leblanc@canada.ca


  • Location

    • Chipewyan Prairie First Nation (Alberta)
  • Project Type

    • Water Management
  • Status

    In progress
  • Start Date

    2020-11-10
  • Proponent

    Chipewyan Prairie First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    81132