Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107)

The proposed project

The Ministry of Transportation and Infrastructure (MoTI) proposes to carry out physical activities related to bridge construction works continuously (24 hours, 7 days a week) for the construction period from October 2020 to December 2023. These works require an amendment to condition 45 of the approved Pattullo Bridge Replacement project permit (PER No. 17-107).The rationale for the extended work hours request is to maintain the construction schedule and align with nighttime works approved under their provincial Environmental Assessment (EA) Certificate (#T19-01).   

Project components associated with this request include general construction activities; works to support installation of in-river piles, for example splicing or welding pile sections together; use of cranes to lift pre-cast concrete panels into place during cantilevered bridge deck construction; shipping of materials to and from the construction site, temporary lighting to illuminate night-time work areas; equipment mobilization and demobilization; concrete pouring. No pile driving will be conducted outside of regular construction hours. 

For more information about the project and construction activities, please go to MoTI's website

More


Latest update

Notice of Determination 

Fraser River, between Surrey and New Westminster, B.C. – February 9, 2021 – The Vancouver Fraser Port Authority has determined that the proposed amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project, spanning the Fraser River between Surrey and New Westminster, is not likely to cause significant adverse environmental effects.

Participate

Contacts

Project and Environmental Review
Vancouver Fraser Port Authority
100 The Pointe, 999 Canada Place
Vancouver, British Columbia V6C 3T4
Email: per@portvancouver.com


  • Location

    • Amendment to the construction hours in respect to condition 45 of the approved Pattullo Bridge Replacement Project (PER No. 17-107) (British Columbia)
  • Nature of Activity

    • Bridges
  • Assessment Status

    Completed
  • Start Date

    2020-11-06
  • Proponent

    Ministry of Transportation and Infrastructure
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    81124
Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Nearby assessments

...within 200 kilometres
Date modified: