YUL Montreal-Trudeau International Airport - Tank dismantling

The project consists of the removal of one 50,000 L underground tank and five (5) above-ground tanks, including three 1,135 L tanks, one 1,000 L tank, and one 1,500 L tank. Piping and distribution pumps will also be removed. These tanks, which are no longer in use, will be emptied, removed and disposed of in accordance with current regulations.

As part of this project, slab, sump, gutter and drain cleaning and the cleaning of oil/water separators will also be carried out. The wash water will be recovered for treatment and disposal in accordance with regulations.

The bottom and walls of the pits will be analyzed before backfilling to ensure that the soils remaining in place comply with the site's use and zoning. The land where the reservoir is located will then be rehabilitated.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

The assessment is in progress.

List all records

Contacts

Public Affairs
ADM Aéroports de Montréal
800 Place Leigh-Capreol
Office 1000
Dorval, QC H4Y 0A5
Email: consultation-projets@admtl.com


  • Location

    • YUL Montreal-Trudeau International Airport (Quebec)
  • Project Type

    • Airport and Airfields
  • Status

    In progress
  • Start Date

    2020-09-22
  • Proponent

    ADM Aéroports de Montréal
  • Authorities

    • Montreal Airport Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    81007