Registry Search Mobile

Registry Search

Wunnumin Lake First Nation Teacherages Project

The Wunnumin Lake First Nation Teacherage project will include the construction of two new Teacherage Duplexes and renovation of the existing Teacherages. The Duplex Construction includes construction of two 149 m2 woodframe buildings with PWF crawlspace foundation with wood/electric heat. The units will be located on undeveloped lots; however, the lots have been identified as part of WLFN subdivision design. Servicing will include extension of the hydro lines, water servicing from the Duplexes to the lot line (for connection to existing watermain), appropriately designed and sized septic fields and driveways will connect to an existing road access.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

June 26, 2020 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments https://iaac-aeic.gc.ca/050/evaluations/document/135219 until July 26, 2020 respecting the determination. .

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - June 26, 2020

List all records

Contacts

  • Indigenous Services Canada - Ontario
  • 100 Anemki Place, Suite 101
  • Fort William First Nation, ON, P7J 1A5
  • Telephone: 807-624-5914
  • Email: julieta.werner@canada.ca

Date modified: