Registry Search Mobile

Registry Search

Alberta Zero Emissions Truck Electrification Collaboration Fueling Station

The proposed project involves the development and demonstration of a cost-effective 450 m2 hydrogen fueling station for highway capable, zero-emission, heavy-duty commercial fleet vehicles, located at the Edmonton International Airport near Edmonton, Alberta. The project includes the following physical activities: site preparation, construction of a 140 m2 concrete pad on which the fueling equipment will sit, installation of fueling equipment and fencing, and operation of the hydrogen fueling station.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given assessment.

 

Latest update

June 24, 2020 – Natural Resources Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Natural Resources Canada is inviting public comments until July 24, 2020 respecting that determination.

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - June 24, 2020

List all records

Contacts

  • Environmental Assessment Division, Office of the Chief Scientist
  • Natural Resources Canada
  • 588 Booth St
  • Ottawa, ON, K1A 0Y7
  • Email: nrcan.ea-ee.rncan@canada.ca

  • Location

    • Edmonton International Airport (Alberta)
  • Project Type

    • Airport and Airfields
    • Alternative Energy
  • Status

    In progress
  • Start Date

    2020-06-24
  • Proponent

    Entity located in an industrial area within the Edmonton International Airport boundary
  • Authorities

    • Natural Resources Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80798

Nearby projects

..within 200 kilometres
Date modified: