Batchewana - New Water Treatment Plant Construction in Goulais Mission

Batchewana First Nation is constructing a new water treatment plant to service community members in Goulais Mission. This plant will be able to provide clean drinking water to band members located in this area of Batchewana First Nation. To construct the delivery system, a new water supply line will be installed with approximately 4.1km of pipe along Goulais Mission main roadway, 660m of pipe installed in Coulis road and 2km of pipe laid in an unnamed subdivision presently being built. The plant itself will be constructed on the shores of lake superior at the end of goulais mission road, and have an intake installed into lake superior with a raw water intake capacity of 397 cubic meters of water/day. The plant will be serviced by electricity at the lot line and he building will occupy a space of 419 square meters and have an emergency backup generator on site, with an aboveground storage tank for storage of diesel fuel. Lot clearing will take place, with tree and grub removal for the construction site. Once the plant is completed, grass will be planted at the site. 


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

February 11, 2020 – Indigenous Services Canada intends to make a determination regarding whether the carrying out of the project is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting public comments https://www.iaac-aeic.gc.ca/050/evaluations/document/133841 until March 12, 2020 respecting the determination. .

Key documents

Key documents
Document Number Document Title File Date
1 Public Comment Period on Intent to Make a Determination - February 11, 2020

List all documents

Contacts

  • Indigenous Service Canada
  • 760 Notre Dame Ave
  • Sudbury, ON, P3A 2T4
  • Telephone: 705-522-3475
  • Fax: 705-677-7976
  • Email: philip.stringer@canada.ca

  • Location

    • Goulais Mission (Ontario)
  • Project Type

    • Building and Property Development
    • Water Management
  • Status

    In progress
  • Start Date

    2020-02-11
  • Proponent

    Batchewana First Nation
  • Authorities

    • Indigenous Services Canada
  • Assessment Type

    Project on federal lands
  • Reference Number

    80470