Westshore Terminals Berth 2 Mooring Dolphin Upgrades

Westshore Terminals Limited Partnership proposes to upgrade four existing mooring dolphins (each made up of multiple steel piles) at Berth 2 at its terminal in Delta, BC. These dolphins were originally designed for vessels with a capacity of 100,000 dead weight tonnes but are now handling vessels up to 185,000 dead weight tonnes. Marine inspections on the dolphins indicate that the dolphins are approaching end-of-life and they need to be replaced.

The project will be completed during two planned terminal shutdowns that are each approximately 24 days long. If approved, this work is expected to occur in the summer of 2020. Works are proposed to occur 24 hours per day during shutdowns. Louder activities, such as pile driving, will be restricted to standard daytime working hours. Construction will be carried out by a marine contractor and will include pile removal, pile installation, and metal works for fender removal. New dolphins will be designed to have fewer but higher capacity piles. The design criteria is for berthing vessels of 185,000 dead weight tonnes that is 75% loaded.


Disclaimer

This map is for illustrative purposes. The markers represent the approximate locations based on available data. More than one marker may be identified for a given project.

 

Latest update

A public participation period is underway.

List all documents

Contacts

  • Project and Environmental Review
  • 100 The Pointe, 999 Canada Place
  • Vancouver, BC, V6C 3T4
  • Email: per@portvancouver.com

  • Location

    • Delta (British Columbia)
  • Project Type

    • Ports and Harbours
  • Status

    In progress
  • Start Date

    2020-01-24
  • Proponent

    Westshore Terminals Limited Partnership
  • Authorities

    • Vancouver Fraser Port Authority
  • Assessment Type

    Project on federal lands
  • Reference Number

    80437