Project Grazing Permits on Saskatchewan First Nations Reserve Lands

  • Location (Saskatchewan First Nation Communities, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80267
  • Last Modified: 2019-11-16
  • Under s. 28(2) of the Indian Act, permits for Grazing purposes are issued  for Saskatchewan First Nation Reserve Lands at the request of the First Nation community. These are short term permits and are non-exclusive use. Standard mitigation measures are in place for the permits. This posting will cover the period from September 11, 2019 until March 31, 2020.

Project Agricultural permits on Saskatchewan First Nation Reserve Lands

  • Location (Saskatchewan First Nations, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80266
  • Last Modified: 2019-11-16
  • Under s. 28(2) of the Indian Act, permits for Agricultural purposes are issued  for Saskatchewan First Nation Reserve Lands at the request of the First Nation community. These are short term permits and are non-exclusive use. Standard mitigation measures are in place for the permits. This posting will cover the period from September 11, 2019 until March 31, 2020.

Project Dokis First Nation Hydro Line Servicing

  • Location (Dokis First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80259
  • Last Modified: 2019-11-16
  • Dokis First Nation is expanding hydro services to new homes along Pine Crescent within Dokis First Nation Territory. This will result in 10 residential lots being serviced with hydro. To accomplish this new hydro line, a 5 metre clearing of trees and shrubs will need to be completed, and new hydro poles will be installed along the way. Please note that Dokis First Nation has assessed this project under their First Nation lands Management Agreement, and have determined that this project will

Project Atikameksheng Anishnawbek On Reserve New Housing

  • Location (Atikameksheng Anishnawbek First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80256
  • Last Modified: 2019-11-16
  • Atikameksheng Anishnawbek First Nation is in the process of building three new residential rental units within their community. Three new lots will be cleared and three units of 1200 square feet will be constructed. The homes will be located on lots 8, 19 and 20 of the Hill Street Subdivision.  Atikameksheng Anishnawbek has previously reviewed this project under their First Nation's Land Management Agreement, and have noted that no significant environmental effects will result from

Project Shepody National Wildlife Area, New Brunswick - Routine Maintenance Upgrades of constructed wetland infrastructure (Segment 12)

  • Location (Shepody National Wildlife Area, New Brunswick)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80302
  • Last Modified: 2019-11-15
  • Ducks Unlimited Canada is proposing to undertake routine maintenance repairs and upgrades to existing constructed wetland infrastructure located at the Shepody National Wildlife Area (segment 12). The Shepody National Wildlife Area is administered under the Wildlife Area Regulations of the Canada Wildlife Act. The 978 hectare National Wildlife Area contains 795 hectares of controlled water level freshwater wetlands, which were built by Ducks Unlimited Canada beginning in 1973. The majority

Project Wetland Walkway Replacement - Hattie Cove

  • Location (Pukaskwa National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80278
  • Last Modified: 2019-11-15
  • Pukaskwa National Park proposes to remove and replace the low lying boardwalk section of the Coastal Hiking Trail at the east end of Hattie Cove which passes over a shallow, open-water wetland of Lake Superior, to improve the condition and safety of this infrastructure. Project will include creation of staging area, transport of materials via helicopter, removal of old wooden boardwalk and installation of new floating plastic walkway. The project will also be assessed by the Department of

Project Gazoduq Project

  • Location (Near Ramore, Ontario) (Saguenay Region, Quebec)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80264
  • Last Modified: 2019-11-15
  • Gazoduq Inc. is proposing the construction and operation of a natural gas pipeline approximately 780 kilometres long between northeastern Ontario and Saguenay, Quebec. This proposed project would connect TC Energy Limited's existing main natural gas transmission system in northeastern Ontario to the proposed Énergie Saguenay Project, a natural gas liquefaction facility by GNL Québec in Saguenay, Québec. The project would also include three compressor stations, one

Project Upgrade of the Windigo Island Docking Infrastructure Accessibility

  • Location (Windigo Islands, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80314
  • Last Modified: 2019-11-15
  • The Project focuses on the design and construction of a steel pipe dock. The project scope includes the drilling of steel pipes into the bedrock, a steel I beam frame with cross bracing installed on top, skirting, a top travel surface, ramps and floating docks. The Project aims to address public health and safety concerns; reduce the probability of asset failure and service interruptions; achieve service levels and key performance indicators established by the asset management plan; and reduce

Project Poplar River Harbour Manitoba - Routine Maintenance Dredging of the Poplar River at Lake Winnipeg - Winter 2019

  • Location (Poplar River Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80252
  • Last Modified: 2019-11-15
  • Poplar River Harbour is located at the East end of Lake Winnipeg at the mouth of the Poplar River, approximately 135 km North of Bloodvien, Manitoba. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Small Craft Harbours is proposing to undertake routine maintenance dredging at Poplar River Harbour.  The scope of this project includes routine maintenance dredging of the West side of the

Project Arnes Harbour Manitoba - Routine Maintenance Dredging of the Drunken River at Lake Winnipeg - Winter 2019

  • Location (Arnes Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80250
  • Last Modified: 2019-11-15
  • Arnes Harbour is located at the West end of Lake Winnipeg at the mouth of the Drunken River, approximately 112 km North of Winnipeg, Manitoba. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Small Craft Harbours is proposing to undertake routine maintenance dredging at Arnes Harbour.  The scope of this project includes routine maintenance dredging of the harbour channel and commercial

Project Dauphin River Harbour Manitoba - Routine Maintenance Dredging of the Dauphin River at Lake Winnipeg - Winter 2019

  • Location (Dauphin River Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80251
  • Last Modified: 2019-11-15
  • Dauphin River Harbour is located at the West end of Lake Winnipeg at the mouth of the Dauphin River, approximately 330 km North of Winnipeg, Manitoba. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Small Craft Harbours is proposing to undertake routine maintenance dredging at Dauphin River Harbour.  The scope of this project includes routine maintenance dredging of the harbour entrance

Project Kingston Mills Outer Weir Masonry Rehabilitation

  • Location (Rideau Canal National Historic Site of Canada, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80313
  • Last Modified: 2019-11-15
  • This project involves the rehabilitation of historic masonry associated with the Outer Weir at Kingston Mills Lockstation. The work zone will be isolated by an upstream cofferdam and downstream rock check with filtration capacity. The upstream cofferdam will include an intake for a conduit to relay water to the downstream side of the work zone. The scope also includes excavation behind the walls to expose and re-point the backside of the walls. The central portion of the walls will be gravity

Project Cowessess 10 MW Solar Project

  • Location (Cowessess IR #73, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80258
  • Last Modified: 2019-11-15
  • Cowessess has been able to secure a 10 MW solar set aside from First Nations Power Authority through their First Nations Opportunity Agreement with SaskPower.  As such, Cowessess will ultimately enterer in a 10 MW Power Purchase Agreement  with SaskPower.  This project will create a long term revenue stream for the community which helps the community achieve their goal of self sustainability.  The project will also bring ancillary economic benefits to the Cowessess First

Project Victoria Beach Harbour Manitoba - Routine Maintenance Dredging of Lake Winnipeg at Victoria Beach - Winter 2019

  • Location (Victoria Beach Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80253
  • Last Modified: 2019-11-14
  • Victoria Beach Harbour is located at the East end of Lake Winnipeg, approximately 100 km North of Winnipeg, Manitoba. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Small Craft Harbours is proposing to undertake routine maintenance dredging at Victoria Beach Harbour.  The scope of this project includes maintenance dredging of the channel entrance. The proposed dredging will be done

Project Wharf Reconstruction - Little Grindstone, MB - Winter/Spring 2020

  • Location (Little Grindstone Harbour, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80254
  • Last Modified: 2019-11-14
  • Little Grindstone Harbour, Manitoba is located on the west shore of Lake Winnipeg in Hecla-Grindstone Provincial Park, and is approximately 48 km north of Riverton, MB. The harbour is an active commercial fishing facility under the administration of Fisheries and Oceans Canada (DFO) Small Craft Harbours Branch (SCH). Small Craft Harbours Branch, (SCH) is proposing to undertake the reconstruction of the marginal wharf at Little Grindstone Harbour.  The scope of work includes the

Project Fraser Grain Terminal - Grain Export Facility Amendment (Utilities)

  • Location (Fraser Grain Terminal - Grain Export Facility Amendment (Utilities), British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80312
  • Last Modified: 2019-11-14
  • Fraser Grain Terminal Ltd (the Applicant) is proposing to undertake utility works related to the Fraser Grain Terminal Project that were not originally included in the approved scope of works. The proposed amended works are as follows: Existing Drainage Ditch Extension along south side of Robson Road - Remove the existing headwall, infill a portion of the existing drainage ditch, install a new manhole and install a new length of 300millimetre reinforced concrete pipe storm line,

Project St Theresa Point Northern Store Contamination Remediation

  • Location (St Theresa Point Former Bulk Fuel Plant, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80311
  • Last Modified: 2019-11-14
  • The Proposed Project Project Summary: The project will involve the installation of a multiphase extraction (MPE) system connected to approximately fifty-eight (58) extraction wells installed across the impacted area to a maximum depth of 13.0 mBGL. The wells will be complimented with independent compressed air lines and steel access covers. Soil vapour from the wells will be extracted under vacuum. Any impacted water entering the system will be treated through the water treatment unit (WTU)

Project Wunnumin H1RCI Compound Construction

  • Location (Wunnumin Lake, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80308
  • Last Modified: 2019-11-13
  • The project consists of constructing the necessary infrastructure in Wunnumin Lake First Nation to serve as a base of operations for Hydro One Remotes Communities Inc. ("Remotes").  This project forms part of the bigger Watay Project (Wataynikaneyap Transmission Project) in which sixteen First Nations are connected to Ontario's Transmission Network.  The project scope includes fencing off an area of approximately 4,688 m2 next to the airport.  The area will then be

Project SaskPower Pole Replacement near Rec Hall

  • Location (Prince Albert National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80307
  • Last Modified: 2019-11-13
  • SaskPower is proposing to replace an urban power pole, transformer, and take off equipment, then trench and lay approximately 30 metres (m) of secondary cable to a customer owned splitter, at which point the customer will be responsible to connections.  Ground disturbance will be limited to the base of the pole and the short run of trenching.   The work will take place near an existing underground cable, within a developed area and existing roadways in NW-10-057-01 W3M, within

Project WWL Underground Storage Tank Removal Annacis Island

  • Location (Delta, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80303
  • Last Modified: 2019-11-12
  • Wallenius Wilhelmsen Solutions Vehicle Services Canada Limited (WWL) proposes to decommission a fueling facility at 100-820 Dock Road, Annacis Island, Delta, British Columbia. The facility consist of a pump island, three underground storage tanks (USTs), and associated infrastructure. The proposed works include the excavation; onsite stockpiling of suspect overburden for analytical testing; and the removal and disposal of three underground storage tanks, impacted water, fuel and overburden at

Project Demolition of aged Royal Canadian Dragoon facilities at Garrison Petawawa

  • Location (Garrison Petawawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80306
  • Last Modified: 2019-11-12
  • There are total of 11 existing aged buildings on federal property, Garrison Petawawa, Ontario, that have been identified to be demolished.   Buildings C-039 (2,084m2), C-040 (2,210m2) and C-103 (2,080m2) will be demolished down to the concrete slab. The slab and foundations will remain below grade. Existing concrete pavement will be used for a parking lot.   Buildings B-101 (383m2), B-102 (708m2), B-104 (1,410m2) and G-022 (131m2) will be completely demolished including

Project James Bay Lithium Mine Project

  • Location (100 kilometres east of James Bay, Quebec)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80141
  • Last Modified: 2019-11-12
  • Galaxy Lithium (Canada) Inc. is proposing the construction, operation and decommissioning of an open-pit lithium mine located approximately 100 kilometres east of James Bay and the Eastmain Cree Village, in Quebec. As proposed, the James Bay Lithium Mine Project would have an estimated mine life of 15 to 20 years, and produce on average 5,480 tonnes of ore per day. The project would include an open-pit mine and concentrator facility, tailings, waste rock, ore and

Project Wahnapitae First Nation New Housing Project - 5 New Homes and 7 Lots Servicing

  • Location (Wahnapitae First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80305
  • Last Modified: 2019-11-12
  • Wahnapitae First Nation is expanding the amount of homes within their community to ensure adequate housing is available to community members. To accomplish this, the community will construct five (5) new homes, and bring in utilities for seven (7) lots to ensure an adequate stock of homes remains available. All homes will be less than or equal to 1250 square feet, and will require drilled wells and septic fields. The homes will be heated via propane heating, and hydro service is readily

Project G Jetty and Jetty 11 Remediation in Esquimalt Harbour

  • Location (Colwood, Esquimalt Harbour, located in the municipality of Colwood British Columbia, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80304
  • Last Modified: 2019-11-12
  • The G Jetty and Jetty 11 Remediation Project is a proposed marine sediment remediation project at the Department of National Defence Colwood facility in Esquimalt Harbour, British Columbia. The Department of National Defence, which administers Esquimalt Harbour, is implementing a remediation and risk management program in Esquimalt Harbour as part of a long-term strategy to address sediments that have been contaminated by historical industrial activities. Various remediation projects have been

Project Mohawks of the Bay of Quinte Remedial Action Plan

  • Location (Parcel 1, Ontario) (Parcel 10) (Parcel 12) (Parcel 5A/C)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80243
  • Last Modified: 2019-11-12
  • The Mohawks of the Bay of Quinte (MBQ) Remediation Project ("the Project") includes the remediation of four areas of known contamination within the MBQ community. The four areas include: Parcel 1, Parcel 5A/C, Parcel 10 and Parcel 12. The Project will be completed in two phases: Phase I: the design of a remedial action plan and tender package by Dillon Consulting, followed by Phase II: the remediation activities which will be completed by external Contractors with oversight from

Project G3 Terminal Vancouver Berth Pocket Obstruction Removals

  • Location (G3 Terminal, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80236
  • Last Modified: 2019-11-08
  • G3 Terminals is proposing to remove large angular rock obstructions from three locations in Burrard Inlet in the vicinity of the Vancouver Berth at G3 Terminals. The three identified rock obstructions will interfere with the transportation of marine vessels to and from the terminal berth and must be removed prior to terminal operations. The Project consists of using a clamshell bucket on a crane, supported by a spud barge to remove the rocks obstructions. Approximately 200 m3 of rock will be

Project Crooked Creek Culvert Replacement

  • Location (Waterton Lakes National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80300
  • Last Modified: 2019-11-08
  • Parks Canada Agency (PCA) is proposing to replace the Crooked Creek culvert (the culvert) at Km 10.0 along Highway (Hwy) 6 in Waterton Lakes National Park (WLNP), Alberta (the Project). The primary objective of the Project is to improve the level of service, Overall Asset Condition Rating, network reliability and performance, and highway safety. The works to undertake the replacement of the culvert will include: removal of the existing culvert (34 m long by 2,100 mm diameter), installation

Project Obashkaandagaang First Nation Water Treatment Project

  • Location (Obashkaandagaang First Nation, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80242
  • Last Modified: 2019-11-08
  • The Obashkaandagaang First Nation requires a new water treatment plant (WTP) and storage reservoir to replace the non-operating water treatment system currently in the community. The project will include installing a water intake pipe into the Lake of the Woods approximately 75 m off of the shore, a backwash outfall pipe approximately 95 m from the shore, constructing a new WTP building with below ground concrete reservoir and installing water service piping throughout the west end of the

Project Global Container Terminal Vanterm Maintenance Dredging

  • Location (Vancouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80234
  • Last Modified: 2019-11-07
  • Global Container Terminal proposes to conduct maintenance dredging along Berths at the Vanterm facility, located at 1300 Stewart Street, Vancouver. The project consists of dredging an estimated 1,300 m3 from Berths 5 and Berth 6 using barge-mounted clamshell equipment. Dredged material will be loaded onto a flat barge and offloaded for upland disposal at an appropriately licensed facility. Run-off water will be collected in holding tanks on the barge, then tested or treated prior to discharge

Project Seabin Installation at Main Street Dock

  • Location (Vancouver, British Columbia, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80227
  • Last Modified: 2019-11-07
  • Vancouver Fraser Port Authority Environmental Programs is proposing to install a Seabin at Main Street Dock in Vancouver, BC. The Project consists of installing metal brackets to the Main Street Dock using a hand drill, and connecting the Seabin to the brackets. The dimensions of the Seabin are 500 x 500 x 1800 mm and it weighs 55 kg. The Seabin acts as a floating garbage bin skimming the surface of the water by pumping water into the device. Water is sucked in from the surface and passes

Project ATCO Miette 5L215 Rebuild

  • Location (Jasper National Park, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80299
  • Last Modified: 2019-11-07
  • ATCO is proposing to replace a 7.6 km section of overhead distribution line in Jasper National Park. The line currently extends from the Fiddle River Ashlar Ridge Lookout to Miette Hot Springs, and will be replaced with an equivalent length of mostly underground distribution line buried 1.2 m deep within the shoulder of the Miette Road. Short overhead segments will be installed where topographical constraints and the road alignment prevent underground installation. The existing line has

Project Windigo Island Water Treatment Project

  • Location (Animakee Wa Zhing First Nation - Windigo Island, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80238
  • Last Modified: 2019-11-07
  • The Animakee Wa Zing First Nation community of Windigo Island requires a new water treatment plant (WTP) and storage reservoir to replace the exsiting water treatment system currently in the community. The project will include installing two new water intake pipes into the Lake of the Woods approximately 150 m off of the shore, a new reject water outfall pipe approximately 100 m into the lake, constructing a new WTP building adjacent to the existing WTP, installing above ground water reservoir

Project Swan River First Nation Waste Diversion and Recycling Facility

  • Location (Swan River First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80233
  • Last Modified: 2019-11-06
  • Swan River First Nation is proposing a 1.05 ha Waste Diversion and Recycling Facility to be built in a partially cleared and disturbed area that has been used by the community of Kinuso as an unofficial waste dump for over a decade. The new Facility will provide infrastructure to support waste diversion and recycling of large, bulky, and construction demolition materials in the Swan River First Nation and surrounding region.

Project Cedar LNG Project

  • Location (Kitimat, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 80208
  • Last Modified: 2019-11-06
  • Cedar LNG Export Development Ltd. is proposing to construct and operate a floating liquefied natural gas (LNG) processing facility and marine export terminal near Kitimat, British Columbia. The proposed project would process and liquefy natural gas to produce approximately 3 to 4 million tonnes of LNG per year and include storage capacity for up to 250,000 cubic metres of LNG. The proposed project would have a lifespan of at least 25 years.

Project Mariner Seafoods Shoreline Protection

  • Location (Mariner Seafoods Shoreline Protection, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80298
  • Last Modified: 2019-11-06
  • JJM Construction Ltd., on behalf of Mariner Seafoods Ltd., (the Applicant) is proposing to conduct improvements to existing shoreline protection infrastructure along the foreshore of the leased property at 2295 Commissioner Street, Vancouver, B.C. The project consists of the removal and disposal of debris and concrete slabs, salvage of existing rip rap, and import of new materials to the site. The Applicant proposes to salvage existing rip rap from the upper shoreline for re-use in

Project Concrete Batch Plant

  • Location (Vancouver, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80297
  • Last Modified: 2019-11-06
  • Graestone Ready Mix Inc. proposes to construct a concrete batch plant on a site of approximately 10,000 square metres at 9260 Oak Street, Vancouver. Should the project be approved, the ready-mix facility would produce 300 to 400 cubic metres of concrete per day to supply to construction projects throughout Metro Vancouver. All cement handling operations would be fully enclosed, and the plant would use clean aggregate products. Project works would include the installation of a batch plant

Project Gordon Island Shoreline Stabilization

  • Location (Thousand Islands National Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80296
  • Last Modified: 2019-11-06
  • This project will involve stabilization of a highly eroded shoreline on Gordon Island.  Wave action combined with recent record high water levels has resulted in erosion of soil, undercutting of banks and vegetation destabilization/washout at the project site. Work will consist of preparation of approximately 20m of shoreline (fixing undercutting and removal of debris), placement of geotextile cloth over full area to be protected, placement of 10"-20" angular stone on cloth and

Project Newfoundland Orphan Basin Exploration Drilling Project

  • Location (343 to 496 kilometres northeast of St. John's, Newfoundland and Labrador)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80147
  • Last Modified: 2019-11-06
  • BP Canada Energy Group ULC is proposing to conduct an exploration drilling project within offshore exploration licences in the Orphan Basin, located 343 to 496 kilometres northeast of St. John's, Newfoundland and Labrador in the Atlantic Ocean. As proposed, the Newfoundland Orphan Basin Exploration Drilling Project would allow the proponent, over a nine-year period, to determine the presence, nature, and quantities of the potential hydrocarbon resource in exploration licences 1145,

Project Maintenance Dredging at Millerand Fishing Harbour

  • Location (Millerand Fishing Harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80295
  • Last Modified: 2019-11-05
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake maintenance dredging at Millerand fishing harbour, located in Magdalen Islands, in the Québec province. The maintenance dredging aims to provide safe and accessible facilities for local fishermen.  The scope of this project includes maintenance dredging of the channel and the basin. The maximum volume of dredged material is about 14 000m3.  The proposed dredging will be carried

Project Maintenance Dredging - St-Godefroi Fishing Harbour

  • Location (St-Godefroi Fishing Harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80294
  • Last Modified: 2019-11-05
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake maintenance dredging at St-Godefroi fishing harbour, located in Gaspésie, in the Québec province. The maintenance dredging aims to provide safe and accessible facilities for local fishermen.  The scope of this project includes maintenance dredging of the channel and the basin. The maximum volume of dredged material is about 5000m3.  The proposed dredging will be carried

Project Maintenance Dredging at Port-Daniel Est Fishing Harbour

  • Location (Port Daniel Est Fishing Harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80293
  • Last Modified: 2019-11-05
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake maintenance dredging at L'Anse-à-Brillant fishing harbour, located in Gaspésie, in the Québec province. The maintenance dredging aims to provide safe and accessible facilities for local fishermen.  The scope of this project includes maintenance dredging of the channel and the basin. The maximum volume of dredged material is about 4000m3.  The proposed dredging will

Project Maintenance Dredging - L'Anse-à-Brillant Fishing Harbour

  • Location (L'Anse-à-Brillant Fishing Harbour, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80292
  • Last Modified: 2019-11-05
  • The Small Craft Harbours Branch of Fisheries and Oceans Canada proposes to undertake maintenance dredging at L'Anse-à-Brillant fishing harbour, located in Gaspésie, in the Québec province.   The maintenance dredging aims to provide safe and accessible facilities for local fishermen.   The scope of this project includes maintenance dredging of the channel and the basin.  The maximum volume of dredged material is about

Project Sidney Spit Buoy Upgrades

  • Location (Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80291
  • Last Modified: 2019-11-05
  • There are two outcomes sought by this project. The first outcome seeks to increase the number of visitor mooring buoys at Sidney Spit from 14 to 21 in order to provide better quality visitor experience while also protecting critical eelgrass habitat. Buoys are attached by chains to 1m cubed cement gravity anchors set on the ocean floor). This project seeks to return the number of visitor mooring buoys to 21 by installing 4 additional anchors on the ocean floor and adding 7 new buoys to the

Project Agricultural License of Occupation for former Walker Ranch

  • Location (Grasslands National Park, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 80290
  • Last Modified: 2019-11-05
  • Parks Canada Agency will be issuing a license of occupation for the former Walker Ranch. These lands were part of an operating cattle ranch and residence at the time PCA acquired them. The license will allow the licensee to reside on site and run a domestic livestock operation. Activities include: -grazing, feeding and moving cattle and/or horses -feed production and transport -maintenance of existing infrastructure and installation of temporary infrastructure -occupying the

Project Fifteen Mile Stream Gold Project

  • Location (95 kilometres northeast of Halifax, Nova Scotia)
  • Assessment Type: Environmental assessment under CEAA 2012
  • Status: In progress
  • Reference Number: 80152
  • Last Modified: 2019-11-05
  • Atlantic Mining NS Corp, a wholly owned subsidiary of Atlantic Gold Corporation, is proposing the construction, operation, decommissioning and reclamation of an open-pit gold mine located approximately 95 kilometres northeast of Halifax, Nova Scotia. As proposed, the Fifteen Mile Stream Gold Project would include open pits, stockpiles, materials storage, crushing and concentrator facilities, water management and treatment infrastructure, mine haul roads, and an above-ground tailings