Westsyde Road Multi-Use Pathway

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination - Infrastructure Canada

  • Project Westsyde Road Multi-Use Pathway
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-09-05
  • Document: 152943E.html
  • Relevance: 378.99
  • Notice of Determination September 5, 2023 – Infrastructure Canada has determined that the proposed Westsyde Road Multi-Use Pathway is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation measures. Mitigation and monitoring ...
1 alternate format found
French HTML
  • Relevance: 327.99
  • Avis de décision 5 septembre 2023 – Infrastructure Canada a déterminé que le projet sentier à usage multiple du chemin Westsyde n'est pas susceptible de causer des effets négatifs importants sur l'environnement. Cette détermination reposait sur les facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et mesures d'atténuation réalisables sur les plans technique et ...

Document Notice of Intent to Make a Determination - Start of Public Comment Period - Infrastructure Canada

  • Project Westsyde Road Multi-Use Pathway
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-05-17
  • Document: 147672E.html
  • Relevance: 367.7
  • Public Notice Westsyde Road Multi-Use Pathway – Public Comments Invited May 17, 2023 – Infrastructure Canada must determine whether the proposed Westsyde Road Multi-Use Pathway, located on Whispering Pines 4 is likely to cause significant adverse environmental effects. To help inform this determination, Infrastructure Canada is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online. Written comments must ...
1 alternate format found
French HTML
  • Relevance: 316.7
  • Avis Public Sentier à usage multiple du chemin Westsyde – Période de consultation publique 17 mai 2023 – Infrastructure Canada doit déterminer si le projet proposé Sentier à usage multiple du chemin Westsyde, situé à Whispering Pines 4 est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, Infrastructure Canada invite le public à formuler des commentaires sur cette détermination. Tous les commentaires reçus ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: