Document Notice of Determination

  • Project IPC 13-35-19-7 Electric Cable Installation - Canadian Forces Base Suffield
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-09-07
  • Document: 152974E.html
  • Relevance: 377
  • Notice of Determination September 7, 2023 The Department of National Defence has determined that the proposed ‘IPC 13-35-19-7 Electric Cable Installation' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community knowledge; comments received from the public; and technically and economically feasible mitigation ...
1 alternate format found
French HTML
  • Relevance: 326
  • Avis de détermination Le 7 septembre 2023 Le Ministère de la Défense nationale a déterminé que le projet proposé ‘IPC 13-35-19-7 Installation de câble électrique' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples autochtones; connaissances autochtones; connaissances communautaires; commentaires reçus du public; et les mesures d'atténuation ...

Document Public Comment Period on Intent to Make a Determination

  • Project IPC 13-35-19-7 Electric Cable Installation - Canadian Forces Base Suffield
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2023-03-16
  • Document: 146954E.html
  • Relevance: 359.47
  • Public Comment Period on Intent to Make a Determination IPC 13-35-19-7 Electric Cable Installation - Canadian Forces Base Suffield March 16, 2023 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered ...
1 alternate format found
French HTML
  • Relevance: 308.47
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination IPC 13-35-19-7 Installation de câble électrique – Base des Forces canadiennes Suffield Le 16 mars 2023 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: