New Dock Installation - 184 Turtlehead Road, Belcarra, BC

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project New Dock Installation - 184 Turtlehead Road, Belcarra, BC
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-11-03
  • Document: 145532E.html
  • Relevance: 348.79
  • Notice of Determination  Belcarra, B.C. – November 3, 2022 – The Vancouver Fraser Port Authority has determined that the proposed New Dock – 184 Turtlehead Road, Belcarra, located at 184 Turtlehead Road, Belcarra, B.C., is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors:  Impacts on rights of Indigenous peoples   Indigenous knowledge  Community knowledge  Comments received from the ...
1 alternate format found
French HTML
  • Relevance: 297.79
  • Avis de détermination  Belcarra, C.-B. – Le 3 novembre 2022 – L'Administration portuaire Vancouver-Fraser a déterminé que la proposition de projet de nouveau quai, situé au 184, route Turtlehead à Belcarra (C.-B.), n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement.  Cette détermination a été obtenue en considérant les facteurs suivants :  Effets sur les droits des peuples autochtones  Connaissances autochtones  Connaissances ...

Document New Dock Installation - 184 Turtlehead Road, Belcarra, BC

  • Project New Dock Installation - 184 Turtlehead Road, Belcarra, BC
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2022-09-15
  • Document: 145109E.html
  • Relevance: 344.21
  • Public notice  New Dock Installation – 184 Turtlehead Road, Belcarra, BC – Public comments invited  September 15, 2022 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed New Dock Installation – 184 Turtlehead Road, Belcarra, BC is likely to cause significant adverse environmental effects. Written comments to be received by October 14, 2022.  To help inform this determination and a decision on whether or not to ...
1 alternate format found
French HTML
  • Relevance: 293.21
  • Avis public  Installation d'un nouveau quai situé au 184, route Turtlehead, à Belcarra (C.-B.) – Le public est invité à formuler des commentaires  Le 15 septembre 2022 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la proposition de plateforme de nidification pour les balbuzards, située dans le fleuve Fraser, le long du banc Sapperton à Coquitlam (C.-B.), est susceptible d'entraîner des effets ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: