Document Minister's Response

  • Project Deadhorse Coulee Reservoir Project
  • Document Category: Additional Information
  • Reference Number: 5
  • Updated: 2022-08-05
  • Document: 144751E.html
  • Relevance: 340.49
  • Minister's Response – Deadhorse Coulee Reservoir Project Physical activities The Bow River Irrigation District is proposing to construct and operate the Deadhorse Coulee Reservoir Project (the physical activities referred to as the Project), a new reservoir located on the Bow River Irrigation District main canal, approximately 10 kilometres southeast of Enchant, Alberta. The reservoir would have a surface area of 470 hectares and a water storage capacity of 24.86 million cubic metres. The ...
1 alternate format found
French HTML
  • Relevance: 289.49
  • Réponse du ministre – projet du réservoir Deadhorse Coulee Activités concrètes Le district d'irrigation de la rivière Bow propose de construire et d'exploiter le projet du réservoir de Deadhorse Coulee, (les activités concrètes que constitue le projet), un nouveau réservoir situé sur le canal principal du district d'irrigation de la rivière Bow, à environ 10 kilomètres au sud-est d'Enchant, en Alberta. Le réservoir aurait une superficie de 470 hectares et une capacité de stockage d'eau de ...

Document Analysis report

  • Project Deadhorse Coulee Reservoir Project
  • Document Category: Additional Information
  • Reference Number: 6
  • Updated: 2022-07-29
  • Document: 144752E.pdf
  • Relevance: 339.85
  • Analysis Report WHETHER TO DESIGNATE THE DEADHORSE COULEE RESERVOIR PROJECT IN ALBERTA PURSUANT TO THE IMPACT ASSESSMENT ACT July 2022 IMPACT ASSESSMENT AG ENCY OF CANADA i Contents Purpose ................................................................................................................... 1 Project ..................................................................................................................... 1 ...
1 alternate format found
French PDF
  • Relevance: 288.85
  • Rapport d’analyse DÉCISION DE DÉSIGNER OU NON LE PROJET DU RÉSERVOIR DEADHORSE COULEE EN ALBERTA EN VERTU DE LA LOI SUR L’ÉVALUATION D’ IMPACT Juillet 2022 AGENCE D’ÉVALUATION D’ IMPACT DU CANADA i Table des matières Objet ........................................................................................................................ 1 Projet ...

Document Notice of Time Limit Resuming

  • Project Deadhorse Coulee Reservoir Project
  • Document Category: Additional Information
  • Reference Number: 4
  • Updated: 2022-05-30
  • Document: 143922E.html
  • Relevance: 334.43
  • Notice of Time Limit Resuming Ottawa — May 30, 2022 — On May 24, 2022, the Bow River Irrigation District (the proponent) addressed the information request from the Agency in relation to the Deadhorse Coulee Reservoir Project. The proponent thereby completed the activity for which it requested the time limit be suspended and the 90-day time limit has resumed. The 90-day time limit is the period of time within which the Minister of Environment and Climate Change must respond, with reasons, to ...
1 alternate format found
French HTML
  • Relevance: 283.43
  • Avis de reprise du délai Ottawa — 30 mai 2022 — Le 24 mai 2022, le Bow River Irrigation District (le promoteur) a fourni à l'Agence les renseignements demandés relativement au projet de réservoir de la coulée Deadhorse. Le promoteur a ainsi terminé l'activité pour laquelle la suspension du délai a été demandé, et le délai de 90 jours a repris son cours. Le délai de 90 jours est la période au cours de laquelle le Ministre doit répondre, motifs à l'appui, à la demande de désignation de ...

Document Notice of Time Limit Suspension with Reasons

  • Project Deadhorse Coulee Reservoir Project
  • Document Category: Additional Information
  • Reference Number: 3
  • Updated: 2022-05-04
  • Document: 143719E.html
  • Relevance: 332.11
  • Notice of Time Limit Suspension with Reasons Ottawa – May 4, 2022 – On April 29, 2022, the Impact Assessment Agency of Canada (the Agency) suspended the 90-day time within which the Minister must respond, with reasons, to the initial request for designation of the Deadhorse Coulee Reservoir Project, proposed by the Bow River Irrigation District (the proponent). The Agency has suspended the time limit based on the request from the proponent that the time limit be suspended to allow it ...
1 alternate format found
French HTML
  • Relevance: 281.11
  • Avis de suspension du délai avec motifs Ottawa – Le 4 mai 2022 – Le 29 avril 2022, l'Agence d'évaluation d'impact du Canada (l'Agence) a suspendu le délai de 90 jours dans lequel le ministre doit répondre, avec motifs à l'appui, à la demande initiale de désignation du projet de réservoir de la coulée Deadhorse, proposé par le Bow River Irrigation District (le promoteur). L'Agence a suspendu le délai en raison de la demande du promoteur de suspendre le délai afin de lui donner suffisamment ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Document Category Display Filters

Date modified: