Royal Military College Museum - Design Phase

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Royal Military College Museum - Design Phase
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2022-03-02
  • Document: 143061E.html
  • Relevance: 324.69
  • Notice of Determination March 2, 2022 – Royal Military College Museum The Department of National Defence has determined that the proposed ‘Design Phase' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measure The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause significant ...
1 alternate format found
French HTML
  • Relevance: 273.69
  • Avis de détermination Le 2 mars 2022 – Musée du Collège militaire royal (CMR) Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Phase de conception des travaux' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le projet est peu ...

Document Public Comment Period on Intent to Make a Determination

  • Project Royal Military College Museum - Design Phase
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-04-22
  • Document: 138769E.html
  • Relevance: 299.11
  • Public Comment Period on Intent to Make a Determination Royal Military College Museum – Design Phase April 22, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, ...
1 alternate format found
French HTML
  • Relevance: 248.11
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Musée du Collège militaire royal (CMR) – Phase de conception des travaux Le 22 avril 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: