Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5CDSB Gagetown

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5CDSB Gagetown
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2023-01-06
  • Document: 146005E.html
  • Relevance: 352.81
  • Notice of Determination January 6,  2023 – 5th Canadian Division Support Base, Gagetown New Brunswick The Department of National Defence has determined that the proposed ‘Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5 CDSB Gagetown' project is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: impacts on rights of Indigenous peoples; Indigenous knowledge; community ...
1 alternate format found
French HTML
  • Relevance: 301.81
  • Avis de détermination Le 6 janvier 2023 – Base de soutien de la 5e Division du Canada, Gagetown Nouveau-Brunswick Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Concevoir et remplacer le franchissement de cours d'eau au ruisseau Brown au chemin Browntown BS 5 Div CA Gagetown' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : répercussions sur les droits des peuples ...

Document Public Comment Period on Intent to Make a Determination

  • Project Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5CDSB Gagetown
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2021-04-13
  • Document: 138624E.html
  • Relevance: 298.39
  • Public Comment Period on Intent to Make a Determination Design and Replace Watercourse Crossing at Brown Brook at Browntown Road 5CDSB Gagetown April 13, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be ...
1 alternate format found
French HTML
  • Relevance: 247.39
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Concevoir et remplacer le franchissement de cours d'eau au ruisseau Brown au chemin Browntown 5CDSB Gagetown Le 13 avril 2021 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: