Document Notice of Determination
- Project Upgrade Range 1 at Garrison Wainwright
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2021-11-06
- Document: 141820E.html
- Relevance: 303.32
- Notice of Determination November 6, 2021 – Garrison Wainwright The Department of National Defence has determined that the proposed ‘Upgrade Range 1 at Garrison Wainwright' is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
- Relevance: 252.32
- Avis de détermination Le 6 novembre 2021 – Garnison Wainwright Le Ministère de la Défense nationale a déterminé que le projet proposé ‘Mise à niveau du champ de tir 1 à la Garnison Wainwright' n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : les mesures d'atténuation réalisables, sur les plans technique et économique Le Ministère de la Défense nationale est convaincu que le projet est peu ...