NGTL West Path Delivery 2023 Project

Registry Search Mobile

Registry Search

Skip to Filters

11 results

Document Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects

  • Project Application for the West Path Delivery 2023 Project
  • Document Category: Additional Information
  • Reference Number: 5
  • Updated: 2023-01-10
  • Document: 146711E.html
  • Relevance: 353.37
  • Parks Canada has issued a notice of determination and decided that the project is not likely to cause significant adverse environmental effects. This notice of determination is being issued by Parks Canada under the Impact Assessment Act. Parks Canada has decided that the project is not likely to cause significant adverse environmental effects. The notice of determination, including mitigation measures is available here for download: Notice of Determination
1 alternate format found
French HTML
  • Relevance: 302.37
  • Parcs Canada publie un avis de décision et détermine que le projet n'est pas susceptible d'avoir des effets négatifs importants sur l'environnement. Le présent avis de décision est publié par Parcs Canada au titre de la Loi sur l'évaluation d'impact. Parcs Canada a déterminé que le projet n'est pas susceptible d'avoir des effets négatifs importants sur l'environnement. L'avis de décision, incluent les mesures d'atténuation, est disponible ici pour téléchargement : Avis de décision

Document Canada Energy Regulator - Certificate of Public Convenience and Necessity GC-134

  • Project Application for the West Path Delivery 2023 Project
  • Document Category: Hearing Documents
  • Reference Number: 4
  • Updated: 2022-12-01
  • Document: 145728E.pdf
  • Relevance: 349.57
  • File OF-Fac-Gas-N081-2020-07 02 1 December 2022 David Yee Regulatory Project Manager Regulatory Facilities NOVA Gas Transmission Ltd. 450 – 1 Street SW Calgary, AB T2P 5H1 Email david_yee@tcenergy.com Elizabeth von Engelbrechten Legal Counsel NOVA Gas Transmission Ltd. 450 – 1 Street SW Calgary, AB T2P 5H1 Email E_vonEngelbrechten@tcenergy.com Sander Duncanson Counsel Osler, Hoskin & Harcourt LLP Suite 2500, Brookf ield Place 225 – 6th Avenue SW ...
1 alternate format found
French PDF
  • Relevance: 298.57
  • Dossier OF-Fac-Gas-N081-2020-07 02 Le 1er décembre 2022 David Yee Installations réglementées NOVA Gas Transmission Ltd. 450, Première Rue S.-O. Calgary (Alberta) T2P 5H1 david_yee@tcenergy.com Elizabeth von Engelbrechten NOVA Gas Transmission Ltd. 450, Première Rue S.-O. Calgary (Alberta) T2P 5H1 E_vonEngelbrechten@tcenergy.com Sander Duncanson Osler, Hoskin & Harcourt S.E.N.C.R.L./s.r.l. Place Brookf ield, bureau 2500 225, Sixième Avenue S.-O. Calgary ...

Document Canada Energy Regulator - GH-002-2020 Report

  • Project Application for the West Path Delivery 2023 Project
  • Document Category: Hearing Documents
  • Reference Number: 3
  • Updated: 2022-05-24
  • Document: 143913E.pdf
  • Relevance: 332.08
  • Canada Energy Regulator Report NOVA Gas Transmission Ltd. GH-002-2020 Canada Energy Regulator Report In the Matter of NOVA Gas Transmission Ltd. Application dated 22 October 2020 for the NGTL West Path Delivery 2023 Project GH-002-2020 May 2022 Materials may be reproduced for personal, educational and/or non-profit activities, in part or in whole and by any means, without charge or further permission from the Canada Energy Regulator, provided that ...
1 alternate format found
French PDF
  • Relevance: 281.08
  • Régie de l’énergie du Canada Rapport NOVA Gas Transmission Ltd. GH-002-2020 Régie de l’énergie du Canada Rapport Relativement à NOVA Gas Transmission Ltd Demande datée du 22 octobre 2020 visant le project de livraison parcours ouest en 2023 GH-002-2020 Mai 2022 Autorisation de reproduction Le contenu de cette publication peut être reproduit à des fins personnelles, éducatives et/ou sans but lucratif, en tout ou en partie et par ...

Document Canada Energy Regulator - Notice of Determination

  • Project Application for the West Path Delivery 2023 Project
  • Document Category: Hearing Documents
  • Reference Number: 2
  • Updated: 2022-05-24
  • Document: 143912E.html
  • Relevance: 332.08
  • In accordance with the Impact Assessment Act, the Commission of the Canada Energy Regulator (Commission) has determined that the portion of the NGTL West Path Delivery 2023 Project located on federal lands is not likely to cause significant adverse environmental effects. In making its determination with respect to the project on federal lands, the Commission considered the factors listed in subsection 84(1) of the Impact Assessment Act. The ...
1 alternate format found
French HTML
  • Relevance: 281.08
  • La Commission de la Régie de l'énergie du Canada a déterminé, aux termes de la Loi sur l'évaluation d'impact, que la partie du projet de livraison parcours ouest de NGTL en 2023, qui se déroule sur des terres domaniales, n'est pas susceptible d'entraîner des effets environnementaux négatifs importants. Pour rendre sa décision relativement au projet sur les terres domaniales, la Commission a ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: