SP1 Compound Fence and Gravel Resurfacing, Op REASSURANCE, Camp Adazi, Latvia

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project SP1 Compound Fence and Gravel Resurfacing, Op REASSURANCE, Camp Adazi, Latvia
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2021-01-21
  • Document: 137906E.html
  • Relevance: 292.22
  • Notice of Determination January 21, 2021 – Camp Adazi, Latvia The Department of National Defence has determined that the proposed SP1 Compound Fence and Gravel Resurfacing is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
  • Relevance: 241.22
  • Avis de détermination Le 21 janvier 2021 – Camp Adazi, Lettonie Le Ministère de la Défense nationale a déterminé que le projet proposé de Clôture du complexe SP1 et revêtement de gravier n'est pas susceptible de causer des effets négatifs importants sur l'environnement La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale est convaincu que le projet est ...

Document Public Comment Period on Intent to Make a Determination

  • Project SP1 Compound Fence and Gravel Resurfacing, Op REASSURANCE, Camp Adazi, Latvia
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-11-12
  • Document: 136725E.html
  • Relevance: 287.11
  • Public Comment Period on Intent to Make a Determination SP1 Compound Fence and Gravel Resurfacing, Op REASSURANCE, Camp Adazi, Latvia November 12, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be ...
1 alternate format found
French HTML
  • Relevance: 236.11
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Clôture du complexe SP1 et revêtement de gravier, Op REASSURANCE, Camp Adazi, Lettonie Le 12 novembre 2020 — Ministère de la Défense nationale doit déterminer si le projet proposé est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: