Annacis Water Supply Tunnel Safe Havens Amendment

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Annacis Water Supply Tunnel Safe Havens Amendment

  • Project Annacis Water Supply Tunnel Safe Havens Amendment
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-11-26
  • Document: 137011E.html
  • Relevance: 289.67
  • Notice of Determination Under the Fraser River, between the City of New Westminster and the City of Surrey, B.C. – November 26, 2020 – The Vancouver Fraser Port Authority has determined that the proposed Annacis Water Supply Tunnel Safe Havens Amendment is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: Impacts on rights of Indigenous peoples Indigenous knowledge Community knowledge Comments ...
1 alternate format found
French HTML
  • Relevance: 238.67
  • Avis de détermination Sous le fleuve Fraser, entre la Ville de New Westminster et la Ville de Surrey, C.-B. – 26 novembre 2020 –  L'Administration portuaire Vancouver-Fraser a déterminé que la modification proposée aux zones de sécurité du tunnel d'approvisionnement en eau Annacis n'est pas susceptible d'entraîner des effets néfastes importants pour l'environnement. Cette détermination a été obtenue en considérant les facteurs suivants : Effets sur les droits des peuples ...

Document Annacis Water Supply Tunnel Safe Havens Amendment

  • Project Annacis Water Supply Tunnel Safe Havens Amendment
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-08-28
  • Document: 135881E.html
  • Relevance: 283.23
  • Public Notice Annacis Water Supply Tunnel Safe Havens Amendment ) – Public Comments Invited August 28, 2020 – As part of its Project and Environmental Review process, the Vancouver Fraser Port Authority must determine whether the proposed Annacis Water Supply Tunnel Safe Havens Amendment, located at 11060 Elevator Road, Surrey is likely to cause significant adverse environmental effects. To help inform this determination and a decision on whether or not to approve the proposed project, ...
1 alternate format found
French HTML
  • Relevance: 232.23
  • Avis public Modification aux zones de sécurité du tunnel d'approvisionnement en eau Annacis – Le public est invité à formuler des commentaires. 28 août 2020 – Dans le cadre de son processus d'examen environnemental et d'examen de projet, l'Administration portuaire Vancouver-Fraser doit déterminer si la modification proposée aux zones de sécurité du tunnel d'approvisionnement en eau Annacis, situé au 11060, chemin Elevator à Surrey, C.-B., est susceptible d'entraîner des effets néfastes ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: