Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination

  • Project Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-08-11
  • Document: 135750E.html
  • Relevance: 280.62
  • Notice of Determination 3rd Canadian Division Support Base Detachment Wainwright, Alberta – August 11 , 2020 – The Department of National Defence is to execute a project to upgrade electrical power for Building 650 at Garrison Wainwright. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
  • Relevance: 229.62
  • Avis de détermination Detachement Wainwright Base de Soutien de la 3e Division du Canada (Alberta), le 11 août 2020 – Le ministère de la Défense nationale doit exécuter un projet visant à mise à niveau de l'alimentation électrique pour le bâtiment 650 (B650) à la garnison Wainwright. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale est convaincu que ...

Document Public Comment Period on Intent to Make a Determination

  • Project Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-06-10
  • Document: 134963E.html
  • Relevance: 276.39
  • Public Comment Period on Intent to Make a Determination Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright June 10, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. ...
1 alternate format found
French HTML
  • Relevance: 225.39
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Mise à niveau de l'alimentation électrique pour le bâtiment 650 (B650) à la garnison Wainwright Le 10  juin  2020 — Ministère de la Défense nationale doit déterminer si le projet proposée est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: