Document Notice of Determination
- Project Electrical Power Upgrade for Building 650 (B650) at Garrison Wainwright
- Document Category: Additional Information
- Reference Number: 2
- Updated: 2020-08-11
- Document: 135750E.html
- Relevance: 290.79
- Notice of Determination 3rd Canadian Division Support Base Detachment Wainwright, Alberta – August 11 , 2020 – The Department of National Defence is to execute a project to upgrade electrical power for Building 650 at Garrison Wainwright. This determination was based on a consideration of the following factors: · technically and economically feasible mitigation measures. The Department of National Defence is satisfied that that the carrying out of the project is not likely to cause ...
1 alternate format found
French HTML
- Relevance: 239.79
- Avis de détermination Detachement Wainwright Base de Soutien de la 3e Division du Canada (Alberta), le 11 août 2020 – Le ministère de la Défense nationale doit exécuter un projet visant à mise à niveau de l'alimentation électrique pour le bâtiment 650 (B650) à la garnison Wainwright. La décision est fondée sur l'examen des facteurs suivants : · les mesures d'atténuation qui sont réalisables d'un point de vue technique et économique. Le Ministère de la Défense nationale est convaincu que ...