Construction and Operation of a Transition Centre at CFB Borden, Ontario

Registry Search Mobile

Registry Search

Skip to Filters

4 results

Document Notice of Determination - Construction and Operation of a Transition Centre at CFB Borden

  • Project Construction and Operation of a Transition Centre at CFB Borden, Ontario
  • Document Category: Additional Information
  • Reference Number: 2
  • Updated: 2020-06-15
  • Document: 134998E.html
  • Relevance: 278.19
  • Notice of Determination Canadian Forces Base Borden, Ontario - June 15, 2020 The Department of National Defence has determined that the proposed Construction and Operation of a Transition Centre at Canadian Forces Base Borden, Ontario is not likely to cause significant adverse environmental effects. This determination was based on a consideration of the following factors: · impacts on rights of Indigenous peoples; and · technically and economically feasible mitigation measures. The ...
1 alternate format found
French HTML
  • Relevance: 227.19
  • Avis de détermination La Base des Forces canadiennes Borden (Ontario) - Le 15 juin 2020 Le Ministère de la Défense nationale a déterminé que le projet proposé, Construction et opération d'un Centre de transition à la Base des Forces canadiennes (BFC) Borden, en Ontario, n'est pas susceptible de causer des effets négatifs importants sur l'environnement. La décision est fondée sur l'examen des facteurs suivants : · les répercussions sur les droits des peuples autochtones; · les mesures ...

Document Public Comment Period on Intent to Make a Determination

  • Project Construction and Operation of a Transition Centre at CFB Borden, Ontario
  • Document Category: For Public Participation
  • Reference Number: 1
  • Updated: 2020-05-14
  • Document: 134797E.html
  • Relevance: 276.02
  • Public Comment Period on Intent to Make a Determination Construction and Operation of a Transition Centre at CFB Borden, Ontario May 14,  2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects. To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. ...
1 alternate format found
French HTML
  • Relevance: 225.02
  • Période de rétroaction du public sur l'avis d'intention de procéder à une détermination Construction and Operation of a Transition Centre at CFB Borden, Ontario le 14  mai  2020 — Ministère de la Défense nationale doit déterminer si le projet proposée est susceptible d'entraîner des effets négatifs importants sur l'environnement. Afin de contribuer à une prise de détermination éclairée, le Ministère de la Défense nationale invite le public à formuler des commentaires sur cette ...

Refine SearchDisplay Filters

Last UpdatedDisplay Filters

Filters

Result Type Display Filters

Date modified: