126294 results

Project Redevelopment of Building 441 at 1740 Woodroffe Avenue (Area X.O)

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90449
  • Last Modified: 2026-06-09
  • Relevance: 414.98
  • Invest Ottawa (IO), in partnership with the National Capital Commission (NCC), is undertaking the demolition and redevelopment of Building 441 at 1740 Woodroffe Avenue, with a target operational readiness date of March 31, 2027.    The proposed project would take place on leased NCC lands and is subject to a federal land use, design, and real estate transaction (FLUDTA) approval under the National Capital Act.    The existing Building 441 ...

Project Increase in wastewater treatment capacity (aerated lagoon system) in Ekuanitshit

  • Location (Ekuanitshit, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90443
  • Last Modified: 2026-06-09
  • Relevance: 414.98
  • The project consists of increasing the capacity of the wastewater treatment plant through the addition of an aerated lagoon with an approximate volume of 3,700 m³, to be developed on the west side of the existing treatment plant. The main works planned as part of the project include: clearing, stump removal, removal of waste materials, and excavation and backfilling work required for site preparation; construction of the lagoon dikes; waterproofing of the ...

Project One Arrow First Nation Road Upgrades

  • Location (ONE ARROW 95, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90527
  • Last Modified: 2026-06-08
  • Relevance: 414.95
  • One Arrow First Nation is proposing the upgrade of existing roadway infrastructure throughout the community, including main access roads, the core area, subdivision roads, and rural residential roadways. The project will also include ditch grading improvements, as required, in areas where roadway drainage has been identified as insufficient. Site preparation activities will include stripping topsoil within roadway right of ways where ditching upgrades will be completed. Construction ...

Project Routine maintenance dredging to maintain the depths of berths, Montreal, Quebec for the period from 2026 to 2030

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90519
  • Last Modified: 2026-06-08
  • Relevance: 414.95
  • The Montreal Port Authority (MPA) plans to carry out annual maintenance dredging at its berths in Montreal for the period from 2026 to 2030. The work consists of the localized removal of sediment accumulations identified through annual bathymetric surveys, in order to maintain the depths required for navigation and consistent with nautical charts. The work areas are identified annually and are limited and dispersed. The work will be conducted using a dredging barge, with disposal of dredged ...

Project One Arrow First Nation Water Treatment Plant Upgrades

  • Location (ONE ARROW 95, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90526
  • Last Modified: 2026-06-08
  • Relevance: 414.95
  • One Arrow First Nation is proposing to upgrade the community's existing water treatment plant (WTP) facility. The project involves structural and finishing improvements to the existing building, replacement of internal mechanical, pumping, and electrical equipment, installation of a new gravity sewer main, construction of a new concrete truck fill pad adjacent to the WTP, and decommissioning of the existing raw water storage reservoir and backwash water pond, including removal and disposal ...

Project Skownan New Child and Family Services Prevention Building

  • Location (Skownan First Nation, Manitoba)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 89596
  • Last Modified: 2026-06-08
  • Relevance: 414.95
  • Project is proposed to encompass acquisition and placement of pre-fabricated (modular) buildings for all four capital assets at a 414 sq m fenced site; CFS office, heated garage, and two 1580 sq ft, 4-bedroom temporary housing units. Water and wastewater servicing requirements will be met through the installation of decentralized water and septic holding tanks. Hydro service hooks up will be to an existing main line. Project will also include parking lot with electrical to support parking ...

Project Keeseekoose Education Center Drainage

  • Location (KEESEEKOOSE INDIAN RESERVE NO. 66, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90340
  • Last Modified: 2026-06-08
  • Relevance: 414.94
  • Keeseekoose First Nation is planning to install two drainage features around the community's Education Center to manage surface runoff. The existing natural drainage path, which runs from the culverts under the highway east of the school to the creek a quarter section west of the school, was disrupted when the Education Center was built. Surface runoff now ponds around the school and is unable to reach the channel that leads to the creek, resulting in flooding of the school basement rather ...

Project Baptiste Nickel Project

  • Location (80 kilometres northwest of Fort St. James, British Columbia)
  • Assessment Type: Planning Phase for Impact Assessment
  • Status: In progress
  • Reference Number: 90051
  • Last Modified: 2026-06-08
  • Relevance: 414.93
  • FPX Nickel Corp. is proposing to construct, operate and decommission a new open-pit nickel mine, located approximately 80 kilometres northwest of Fort St. James in central British Columbia. As proposed, the Baptiste Nickel Project would include a mine site, associated infrastructure and a transmission line to an existing BC Hydro substation near Fraser Lake. The proponent is considering two routes for access, primarily utilizing existing and upgraded forest service roads. The project would have ...

Project Demolition of Silo and Garage – 3160 Ramsayville Road, Ottawa

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90525
  • Last Modified: 2026-06-08
  • Relevance: 414.93
  • The National Capital Commission (NCC) proposes to demolish two deteriorated agricultural structures located at 3160 Ramsayville Road in Ottawa, Ontario, within the Greenbelt. The site is a historic farmstead visible from Ramsayville Road, Russell Road and Highway 417 and contains several assets, including a farmhouse and barn that will remain. The proposed works involve the demolition of a concrete panel silo and a timber-frame shed/garage.   The project is proposed on federal lands ...

Project Latvia - Ceri Military Base - Helicopter Landing Zone (HLZ) construction

  • Location (Camp Ceri, Latvia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: Completed
  • Reference Number: 90291
  • Last Modified: 2026-06-08
  • Relevance: 414.93
  • The Department of National Defence (DND) has proposed a project. This project involves the construction of two Helicopter Landing Zones (HLZ), with a proposed 13 600 m2 footprint. The area is currently a developed land with existing gravel pad, French drains and fencing on all four sides. The intent is to transform the area into a rigid concrete apron with two clearly identified HLZ.

Project Latvia - Ceri Military Base - Warehouse Building and Logistics Yard

  • Location (Camp Ceri, Latvia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: Completed
  • Reference Number: 90290
  • Last Modified: 2026-06-08
  • Relevance: 414.92
  • The Department of National Defence (DND) has proposed a project. This project involves the construction of a logistics yard and warehouse building, on previously developed land on the Ceri Military Base in Latvia, where ISO shipping containers and their contents will be moved and stored. The warehouse will be capable of hosting up to 6 ISO Multimode containers. The warehouse construction will also include 3 offices, an issuing counter and some climate-controlled racking. The majority of the ...

Project Highway 93A Mile 5 Hill Slope Stabilization

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90524
  • Last Modified: 2026-06-08
  • Relevance: 414.92
  • Parks Canada is proposing slope stabilization work along Highway 93A in Jasper National Park, at a location commonly known as Mile 5 Hill. The slope extends for 1 kilometer beside the roadway and is experiencing erosion and rockfall hazards that have increased since the 2024 Jasper Wildfire. A site-specific, targeted approach will be used to address different areas of instability along the slope, rather than applying a single solution across the entire site. Potential activities include a range ...

Project Latvia - Ceri Military Base - Vehicle Storage Building

  • Location (Camp Ceri, Latvia, Outside Canada)
  • Assessment Type: Project outside of Canada
  • Status: Completed
  • Reference Number: 90282
  • Last Modified: 2026-06-08
  • Relevance: 414.92
  • The Department of National Defence (DND) has proposed a project. The project involves the building of a 11,000 square meters of footprint permanent building, designed for vehicle storage with capacity for up to 48 military vehicles. The building will also include a classroom, small offices, and storage rooms for vehicle kit, weapons, and communications systems. The construction will occur on developed land with existing gravel lot for outdoor vehicle storage.

Project Edith Cavell Road KM 1.6 Slope Stabilization

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90523
  • Last Modified: 2026-06-08
  • Relevance: 414.92
  • Parks Canada is proposing slope stabilization work along Edith Cavell Road in Jasper National Park, at a location where the existing slope stabilization measure, an interlocking concrete block retaining wall, is beginning to fail due to increased erosion of the slope above following vegetation loss during the 2024 Jasper Wildfire. A site-specific, targeted approach will be used to address the area of instability, including slope flattening and the installation of an engineered control measure ...

Project The Greenbank Municipal Transformer Station Project - Hydro Ottawa

  • Location (CFIA Campus, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90521
  • Last Modified: 2026-06-08
  • Relevance: 414.92
  • To ensure Ottawa's south west region has the power to grow, Hydro Ottawa Limited (Hydro Ottawa) will construct a new 27.6 kV municipal transformer station on Greenbank Road, approximately 450 metres south of the Hunt Club Road intersection. The station, to be constructed within the National Capital Region Greenbelt, will serve existing customers and support projected growth in electricity demand for new residential and commercial developments in south Nepean for many years to come. The ...

Project Redevelopment of Building 430 at 1740 Woodroffe Avenue (Area X.O)

  • Location (Ottawa, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90450
  • Last Modified: 2026-06-08
  • Relevance: 414.87
  • Invest Ottawa (IO), in partnership with the National Capital Commission (NCC), is undertaking the demolition and redevelopment of Building 430 at 1740 Woodroffe Avenue, with a target operational readiness date of March 31, 2027.    The proposed project would take place on leased NCC lands and is subject to a federal land use, design, and real estate transaction (FLUDTA) approval under the National Capital ...

Project Collins Bay Institution – Fuel Storage Tank Replacements (4)

  • Location (Collins Bay Institution, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90451
  • Last Modified: 2026-06-08
  • Relevance: 414.87
  • Correctional Service Canada requires the replacement of four (4) fuel storage tanks at the Collins Bay Institution site. The four tanks are all greater than 20 years old and deteriorating. The existing tanks on-site are all concrete encased petroleum fuel storage tanks. The project will entail decommissioning and removal of the existing tanks, design of tanks and product transfer areas, and installation of new tank systems.

Project Warkworth Institution – Fuel Storage Tank System Replacements and Removals (8)

  • Location (Warkworth Institution, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90455
  • Last Modified: 2026-06-08
  • Relevance: 414.87
  • Correctional Service Canada requires the removal and replacement of five (5) fuel storage tanks at the Warkworth Institution site as well as three (3) additional fuel tank systems require removal with no replacements contemplated. The tanks are all greater than 20 years old and deteriorating. The existing tanks on-site are concrete encased petroleum fuel storage tanks. The project will entail decommissioning and removal of the existing tanks, design of tanks and product transfer areas, and ...

Project New Fibre Installation - Gulf Islands

  • Location (Project Site 1:TSA XANA 18, British Columbia) (Project Site 2: Gulf Islands National Park Reserve, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90453
  • Last Modified: 2026-06-07
  • Relevance: 414.76
  • City West Cable & Telephone Corp. plans to install underground fiber optic cabling, for Internet purposes, to all residential homes in the Mowachaht/Muchalaht and Sidney Island community. The project involves the installation of approximately 3 km of underground fiber optic cable. The cable is to be buried by directional drilling, trenching, or using existing conduits, or a combination of these methods in existing roadway alignments.

Project Parks Canada Agency Sulphur Mountain Boardwalk Repairs

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90456
  • Last Modified: 2026-06-07
  • Relevance: 414.76
  • Parks Canada plans to complete various repairs along the Sulphur Mountain Boardwalk. The work will involve repairing concrete and sonotube foundations, as well as worn steel railing posts and vertical support frames. The repairs will take place in two phases over two summers. The first phase will occur in summer 2026 and will focus on steel repairs. This work is expected to last eight weeks. The second phase will take place in summer 2027 and will involve foundation repairs over a four-week ...

Project Mortier Bay Marine Terminal Project

  • Location (Mortier Bay Marine Terminal, Newfoundland and Labrador)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90452
  • Last Modified: 2026-06-07
  • Relevance: 414.76
  • Project Description Mortier Bay Marine Terminal Ltd. is planning to construct and operate the Mortier Bay Marine Terminal (MBMT; the "Project"), a multi-purpose marine terminal that will support regional marine transportation and economic development. The Project will be located on the northern shore of Mortier Bay, near Marystown, NL. MBMT's proposed marine infrastructure will consist of a marginal wharf complex that can be built through a basic sheet pile and infill ...

Project Infield Concourse Hardstands & Taxiway Connections

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90445
  • Last Modified: 2026-06-06
  • Relevance: 414.65
  • The Proposed Project: Infield Concourse Hardstands & Taxiway Connections  This project involves the following: As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, Infield Concourse Hardstands and associated infrastructure are proposed to be constructed on the Airfield. The new Infield Concourse Hardstands are to be located just northwest of the existing Infield ...

Project Spring Creek Triple Box Culvert Relief Pipe

  • Location (Toronto Pearson International Airport, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90444
  • Last Modified: 2026-06-06
  • Relevance: 414.65
  • Proposed Project: Spring Creek Triple Box Culvert Relief Pipe As part of the Greater Toronto Airports Authority's (GTAA's) Toronto Pearson Airport Longterm Investment in Facilities & Terminals (LIFT) Program, a relief pipe is proposed at the Spring Creek Triple Box Culvert to ensure the continuous operation of Airport Operation and aircraft movement. Spring Creek is a watercourse that enters the airport from the north under Derry Road and crosses under the runway and taxiways ...

Project Pasqua First Nation Solid Waste Transfer Station

  • Location (Treaty Four Reserve Grounds 77, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90454
  • Last Modified: 2026-06-06
  • Relevance: 414.65
  • Pasqua First Nation is proposing to construct a new solid waste transfer station. The solid waste transfer station facility will include construction of an access road, a small building, roadways, collection bins and retaining walls at drop off/unloading locations. The project will be designed for a 25-year design horizon and will support a projected population of 3,473 people by the year 2049. The new transfer station will be located approximately 300 metres southwest of the existing Pasqua ...

Project Mount Helmcken telecommunications tower replacement

  • Location (Mount Helmcken, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90189
  • Last Modified: 2026-06-05
  • Relevance: 414.63
  • The Canadian Coast Guard (CCG)Has altered its planned Tower build at the Mt. Helmcken Communications site. The initial work plan will be the same as before, however instead of a free standing tower, a guyed tower will be installed. Below is the updated plan. This project is planned for August 2026 and will be conducted in four phases. In Phase 1, CCG crews will arrive on site and remove the antennas and salvageable equipment from the small tower located sixteen meters southwest of the ...

Project Gatineau Promenade Culvert Rehabilitation (P8)

  • Location (Gatineau Park, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90522
  • Last Modified: 2026-06-05
  • Relevance: 414.62
  • The National Capital Commission (NCC) is proposing the rehabilitation and replacement of an existing culvert under the Gatineau Promenade in Gatineau Park, located approximately 280 metres south of Chemin du Lac Meech (the Project). The culvert conveys water from a pond on the west side of the roadway to a wetland on the east side and has historically experienced repeated blockages, likely due to sediment accumulation and beaver activity. Following a significant rainfall event in August 2024, ...

Project Saddle Lake Cree Nation Pathway to Learning

  • Location (Saddle Lake Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90300
  • Last Modified: 2026-06-05
  • Relevance: 414.61
  • Saddle Lake Cree Nation is proposing the development of a new pedestrian walkway, called "Pathway to Learning", a 2850 meter long 3 meter wide paved pathway that will connect the nearby 40 Acre Housing Development to the Saddle Lake Townsite. The pathway will start at the western boundary of 40 Acre moving east following the south side of Highway 652,  and continuing south along the west side of 50th St up to the SW 1 Road. Amenities along the pathway will include way-finding and ...

Project Development of artificial nesting sites for turtles

  • Location (La Mauricie National Park, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 80269
  • Last Modified: 2026-06-05
  • Relevance: 414.61
  • A 7.0 x 9.0-metre turtle nesting  site will be created in La Mauricie National Park. The organic soil present on this surface will be removed using motorized equipment. A geotextile will be put in place once the organic soil is removed to prevent vegetation regrowth. A minimum thickness of 30 cm of sand and gravel with a diameter of less than 20 mm will be added above the geotextile over the entire area to provide a suitable substrate for turtle nesting. The top and bottom of the bank will ...

Project Bell AI Fabric Data Centre Project

  • Location (Rural Municipality of Sherwood, Saskatchewan)
  • Assessment Type: Request for designation not applicable
  • Status: Completed
  • Reference Number: 90514
  • Last Modified: 2026-06-05
  • Relevance: 414.61
  • Bell Canada is proposing to construct a new data centre in the Rural Municipality of Sherwood, Saskatchewan. As proposed, the Bell AI Fabric Data Centre Project would involve the development of a 300-megawatt industrial artificial intelligence data centre on a 65-hectare agricultural site. Electricity for the project would be supplied through the provincial electrical grid. Additionally, project activities include pre-construction geotechnical and piling depth testing, site preparation and ...

Project Fire Hall 27 Demolition

  • Location (Calgary International Airport, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90520
  • Last Modified: 2026-06-05
  • Relevance: 414.6
  • Lot MK.13 at the Calgary International Airport currently houses a 1960's two-storey 7200 sqft. Building T042 (old Fire Hall 27) that is slated for demolition. The project will disconnect, decommission, cap, mark, and where necessary, remove all utilities including electricity, gas, sanitary, and water lines at the closest t-junction / manhole / junction box adjacent to the building within the property line and remove and dispose of the existing building, including any hazardous materials, ...

Project Rideau Canal Wall Repairs

  • Location (Rideau Canal National Historic Site, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90504
  • Last Modified: 2026-06-05
  • Relevance: 414.58
  • This project involves rehabilitation of a section of vertical concrete retaining wall that is part of the Rideau Canal National Historic Site. The site is owned and operated by the Ontario Waterways Unit of the Parks Canada Agency. The project includes the rehabilitation of approximately 100 meters of the east canal wall section located along Colonel By Drive near Clegg Street, in Ottawa, Ontario. The proposed repairs would return the wall section to a "good condition" and includes ...

Project Petit-Gaspé Bridge embankment riprap rehabilitation

  • Location (Forillon National Park of Canada, Quebec)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90447
  • Last Modified: 2026-06-05
  • Relevance: 414.54
  • Parks Canada is planning to carry out corrective work on the Petit-Gaspé Bridge embankments to ensure the stability and long-term durability of the infrastructure. The riprap installed during previous work completed in 2017 has undergone progressive erosion, particularly as a result of hydrological flooding and winter storms, causing some of the material to be displaced into the watercourse bed. Following a technical inspection carried out in 2025, recommendations were made to restore ...

Project Piapot First Nation Commercial Office Building

  • Location (Piapot Urban Reserve, Regina, Saskatchewan)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90439
  • Last Modified: 2026-06-05
  • Relevance: 414.54
  • Young Dog Developments Limited Partnership (wholey owned entity of Piapot First Nation) is proposing to construct a new commercial office development on the Piapot Urban Reserve located at 1101 Angus Street in Regina, SK. The development project consists of a 24,392 sq. ft. two story retail and commercial office building and associated parking and landscaping. The development has been designed to be a multi-tenant facility with spaces available for individual retail and office spaces. The ...

Project O'Chiese First Nation Road Landslide Remediation Project

  • Location (O'Chiese First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90446
  • Last Modified: 2026-06-05
  • Relevance: 414.54
  • O'Chiese First Nation is proposing the construction of permanent stabilization works along O'Chiese I Road, located on reserve. The site has experienced progressive slope movement and roadway distress since 2021, resulting in the closure of the eastbound lane and installation of a temporary gravel detour. Project activities include the construction of a cast-in-place pile wall, culvert replacement, roadworks and grading. May 14 2026 - Proponent confirms cuvlert replacement no ...

Project Installation of a Permeable Adsorptive Barrier (PAB) at 22 Wing North Bay

  • Location (22 Wing North Bay, Ontario)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90412
  • Last Modified: 2026-06-05
  • Relevance: 414.54
  • The Department of National Defence (DND) is proposing a project. DND is proposing to install a 250 m long in-situ permeable adsorptive barrier (PAB) to remediate groundwater impacted by per- and polyfluoroalkyl substances (PFAS) within the bedrock valley at 22 Wing North Bay. Pilot-scale testing will be conducted to evaluate the performance of colloidal activated carbon (CAC) products followed by full-scale implementation and long-term monitoring. Project activities will ...

Project River Cree Golf and Games Recreational Facility

  • Location (Enoch Cree Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90448
  • Last Modified: 2026-06-05
  • Relevance: 414.54
  • Enoch Cree Nation is proposing the construction of a two-storey recreational facility with a footprint of 2,951 square meters. The main level of the building with a gross floor area of 2,462 sq m will contain a reception area, pro shop, office spaces, kitchen, restaurant, bar and lounge, arcade, pool, two party rooms, bathrooms, two (2) suites, mechanical rooms, golf equipment area, and golf 15 driving range launch pads (i.e. double decker driving range). The second level of the building, with ...

Project False Creek Small Craft Harbour Limited Sediment Remediation and Tidal Boat Grid Removal

  • Location (False Creek Harbour, Vancouver, 1505 West 1st Avenue, Vancouver, V6J 1E8, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90518
  • Last Modified: 2026-06-04
  • Relevance: 414.51
  • The Project is located in False Creek Inlet in Vancouver, British Columbia. Work to decommission the southern active boat grid and remediate the sediment in the northern grid of the False Creek Small Craft Harbour falls within the mandate of the Federal Contaminated Sites Action Plan to reduce environmental and human health risks from known federal contaminated sites. Tidal grids were typically used for vessel maintenance during low tide periods and these maintenance activities have the ...

Project OS-6891 Authorization to Construct and Operate a Surface Lease

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90393
  • Last Modified: 2026-06-04
  • Relevance: 414.51
  • A surface lease consisting of 2.3 ha. area for drilling and operating a multiwell oil padsite will be constructed and maintained for the operating life of the eight (8) proposed wells, then decommissioned and reclaimed before the lease agreement is surrendered. The project padsite will utilize a previously surveyed and recently reclaimed padsite. The padsite has been located to minimize impacts to adjacent wetlands and maintain a > 45 m setback. No fish bearing waterbodies or large, open ...

Project OS-6908 Authorization to Construct and Operate a Surface Lease

  • Location (Frog Lake First Nation, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90385
  • Last Modified: 2026-06-04
  • Relevance: 414.51
  • A surface lease consisting of 4.1 ha. area for drilling and operating a multiwell oil padsite will be constructed and maintained for the operating life of 20 proposed wells, then decommissioned and reclaimed before the lease agreement is surrendered. The project padsite will utilize a previously surveyed and recently reclaimed padsite, with an extension area to the west. The padsite has been located to utilize an existing access road and to avoid wetland areas. No fish bearing waterbodies or ...

Project Expansion of shed 43, Laurier terminal - Port of Montreal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Terminated
  • Reference Number: 82987
  • Last Modified: 2026-06-04
  • Relevance: 414.5
  • The proposed project consists of expanding shed 43 located at the Laurier terminal of the Port of Montreal (section 43). The expansion will be carried out on the east side of the existing shed over an area of 3,700 m2. The architecture and color of the extension will be similar to the existing shed, but approximately 6.6m lower, or about 24 m high. The expansion of shed 43 will make it possible to compensate for the areas of sheds 39-40 that will eventually be demolished. It will also optimize ...

Project Fording River Extension Project

  • Location (Elkford, British Columbia)
  • Assessment Type: Impact Assessment by the Agency
  • Status: In progress
  • Reference Number: 80702
  • Last Modified: 2026-06-04
  • Relevance: 414.5
  • EVR Operations Limited is proposing to extend the life of its existing Fording River Operations, a metallurgical coal mine located approximately 15 kilometres northeast of Elkford, British Columbia. As proposed, the Fording River Extension Project would include project-specific components such as an open pit, waste-rock storage areas, warehouses, maintenance and fueling facilities, access roads, and linkages to Fording River Operations' power and utilities. The Fording River Extension ...

Project Raising the seabed at Quay 01 at the Contrecoeur Marine Terminal, Port of Montreal

  • Location (Port of Montreal, Quebec)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 88991
  • Last Modified: 2026-06-04
  • Relevance: 414.5
  • Wharf 01 at the Contrecoeur Terminal is a steel sheet pile wharf built in 1955 on the south shore of the St. Lawrence River. The original sea level at the wharf was -10.80 m (chart datum or ZDC). Over the years, the seabed in front of the wharf has gradually deepened as a result of the propellers and bow thrusters of ships docking and leaving the wharf, to the point where the seabed level is now -11.0 m to -13.5 m ZDC (according to a 2022 bathymetric survey), threatening the stability and ...

Project Twinning of the Trans-Canada Highway in Manitoba

  • Location (Whiteshell Provincial Park, Manitoba) (Whiteshell Provincial Park, Manitoba)
  • Assessment Type: Request for designation not applicable
  • Status: Completed
  • Reference Number: 90348
  • Last Modified: 2026-06-04
  • Relevance: 414.5
  • Manitoba Transportation and Infrastructure is proposing to construct two new lanes along a 16-kilometre stretch of the Trans-Canada Highway, about five kilometres west of Provincial Road 301 and near the Manitoba/Ontario border in Whiteshell Provincial Park, Manitoba. As proposed, the Twinning of the Trans-Canada Highway Project in Manitoba would involve expanding the existing two-lane highway into four lanes, rebuilding or replacing two interchanges, upgrading access at Hunt Lake and ...

Project Port of Quebec International Container Terminal Project

  • Location (Port of Quebec, Quebec)
  • Assessment Type: Request for designation
  • Status: In progress
  • Reference Number: 90511
  • Last Modified: 2026-06-04
  • Relevance: 414.48
  • QSL International Ltd. is proposing the development of an international container terminal at the Port of Québec, in the Beauport sector of Québec City. The project involves redeveloping land already operated by the proponent. This space would be used to store containers, with a maximum capacity of 200,000 twenty-foot equivalent units (TEUs) per year. The project would use existing wharves, would not encroach on the river and would not include any work in the water.

Project Sidney Operations Centre Fuel System and Dock Replacement

  • Location (Gulf Islands National Park Reserve of Canada, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 90384
  • Last Modified: 2026-06-04
  • Relevance: 414.48
  • The proposed project involves the replacement of the existing marine fuel storage and dispensing system and marine docks at the Sidney Operations Centre within Gulf Islands National Park Reserve. These facilities have reached the end of their service life and require replacement to ensure marine operations can continue to function safely and efficiently. The dock layout will remain largely unchanged, with the replacement of existing piles and the potential installation of one additional pile. ...

Project Kwikwasut'inuxw Haxwa'mis First Nation - Seawall and Bioengineered Slope Construction

  • Location (Kwikwasut'inuxw Haxwa'mis First Nation - Seawall and Bioengineered Slope Construction, British Columbia)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 85781
  • Last Modified: 2026-06-04
  • Relevance: 414.47
  • The Kwikwasut'inuxw Haxwa'mis First Nation (KHFN) aims to construct a new seawall and bioengineered slope to address natural threats to KHFN's Village of Gwa'yas'dums on Gilford Island. Construction of these assets would protect critical infrastructure and services within the community, and reduce risk of population displacement due to natural hazards. Project activites would occur on the KHFN's Gwayasdums No. 1 Indian Reserve lands.   The project would ...

Project Cascade Creek Restoration Large Woody Debris Installation

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90435
  • Last Modified: 2026-06-04
  • Relevance: 414.43
  • This project is part of the broader Cascade Creek Restoration Project, for which a Basic Impact Assessment (BIA) was approved by the Field Unit Superintendent in September 2018 (BNP 1008). The goal of this phase is to improve habitat suitability and instream cover for westslope cutthroat trout by adding large woody debris to the stream channel using post assisted log structures (PALS) and by felling select trees into the channel using a grip hoist. Instream cover is an essential habitat ...

Project Town of Banff 25DP108 Banff Trail Riders Visitor Interpretation Centre and Riding Arena

  • Location (Banff National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: In progress
  • Reference Number: 90442
  • Last Modified: 2026-06-04
  • Relevance: 414.43
  • The Banff Trail Riders have proposed building a visitor interpretive centre and riding arena at 100 Sundance Road. The project will include removing several existing buildings across the site and combining their functions into a single, centrally located facility. It will also involve changes to the property's landscaping and underground utilities. Overall, the project aims to modernize the site, meet current health and safety requirements, and improve experiences for visitors and staff.

Project Parks Canada Agency Brazeau Lake Bridge Replacement

  • Location (Jasper National Park of Canada, Alberta)
  • Assessment Type: Project on federal lands
  • Status: Completed
  • Reference Number: 85886
  • Last Modified: 2026-06-03
  • Relevance: 414.4
  • The Brazeau bridge is a stream-crossing on the Brazeau Loop hiking trail in Jasper National Park. The trail has been divided since the washout of this bridge in spring 2022. Parks Canada Agency proposes to replace the existing damaged wooden bridge with a sturdy pre-fabricated bridge made from fiberglass reinforced polymer (FRP). The bridge will be placed on two concrete piers and two wooden abutments. The piers will be constructed within the stream bed by pouring concrete into two 2m x 1 m x ...