Notice of intent to make a determination 

Muskoday First Nation - Community Access Road - Public Comments Invited

February 28, 2023 - Indigenous Services Canada must determine whether the proposed Muskoday First Nation - Community Access Road, located on Muskoday First Nation Reserve, is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.

Written comments must be submitted by March 29, 2023 to:

Indigenous Services Canada
SK Region, Environment Unit
1827 Albert Street
Regina, SK S4P 2S9
aadnc.isc-skenv.aandc@canada.ca

The Proposed Project

Construction of a new second access road to the community. Proposed roadway is approximately 1.8km in length, connecting Coxby Road to the existing core area subdivision area. Activities to include: topsoil stripping, excavation of drainage ditches and construction of roadway subgrade, base gravel installations, culvert installations, street lights, topsoil replacement and landscaping, seeding, traffic gravel placement.

Document Reference Number: 1

Date modified: