Public Notice

YMX International Aerocity of Mirabel - Installation of a perimeter fence in the western sector of the airport site - Public Comments Invited

February 28, 2023 - ADM Aéroports de Montréal must determine whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this determination, ADM Aéroports de Montréal is inviting comments from the public respecting that determination. All comments received will be considered public and may be posted online.

Written comments must be submitted by March 30, 2023 to:

Public Affairs
ADM Aéroports de Montréal
800 Place Leigh-Capreol
Office 1000
Dorval, Quebec H4Y 0A5
Email: consultation-projets@admtl.com

The Proposed Project

The project consists of moving the perimeter fence that establishes the limit of the restricted area and the road along thte fence in the western sector of the International Aerocity of Mirabel (YMX) in order to allow the expansion of the western industrial zone. The installation of the new security fence is planned on the current lots 6,488,250 and 2,455,566 of the renovated cadastre. It will determine the limits of the restricted area of the northwest area of the airport site over a length of approximately 2,200 linear meters and a height of approximately 2.13 m. The proposed fence route is optimized to minimize its impact on sensitive environments, in particular water environments on the site.

Document Reference Number: 1

Date modified: