July 26th, 2021 – The Montreal Port Authority (MPA) has determined that the proposed project Removal of obstructions to navigation at the berths of Montreal and Contrecoeur for the years 2021 – 2025 is not likely to cause significant adverse environmental effects.

 

Mitigation measures taken into account for this determination are:

  • Surface water managememt
  • Containment and spill management
  • Operation of machinery
  • Community impact
  • Contaminated sediment management

 

Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part

Document Reference Number: 2

Date modified: