July 26th, 2021 – The Montreal Port Authority (MPA) has determined that the proposed project Removal of obstructions to navigation at the berths of Montreal and Contrecoeur for the years 2021 – 2025 is not likely to cause significant adverse environmental effects.
Mitigation measures taken into account for this determination are:
- Surface water managememt
- Containment and spill management
- Operation of machinery
- Community impact
- Contaminated sediment management
Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part
Document Reference Number: 2