August 25nd, 2022 – The Montreal Port Authority (MPA) has determined that the proposed project of Stormwater management system, Logistec Stevedoring, Contrecoeur is not likely to cause significant adverse environmental effects.

Mitigation measures taken into account for this determination are:

  • Containment and spill management
  • Erosion and sediment control
  • Dust control
  • Contaminated soil management
  • Surface water management
  • Waste management
  • Operation of machinery

Therefore, the MPA may perform any duty or function to enable the project to be carried out in whole or in part.