Public Comment Period on Intent to Make a Determination
Single Well Battery Tie-in Project – Canadian Forces Base (CFB) Suffield

January 12, 2022 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by January 31, 2022 to:
Mr. Danny Laganiere, Base Environmental Officer
Mailing Address:  CFB Suffield, Box 6000 St Main, Medicine Hat
Alberta, Canada, T1A 8K8
E-mail:  Danny.Laganiere@forces.gc.ca

or


IPC Canada Ltd.
E-mail:  regulatory.ca@international-petroleum.com

The Proposed Project

International Petroleum Corp. IPC Canada Ltd is proposing to install pipelines to 9 producing oil wells within CFB Suffield, approximately 55 kilometers from Medicine Hat, Alberta. All wells are currently producing to single well batteries (SWB). Installing pipelines will increase the efficiency of operations by eliminating trucking and product transfer, while reducing emissions. Approximately 11 kilometers of new right-of-way (ROW) with a width of 15 meters will be required for the installation of the pipelines. The ROWs will be reclaimed once construction is complete and surrendered upon exhaustion of the productive life of the associated wells.

Document Reference Number: 1

Date modified: