September 27, 2021 – Indigenous Services Canada has determined that the proposed Heiltsuk Phase 3 Water System Upgrades is not likely to cause significant adverse environmental effects.

The determination was based on the following factors:

  • The proposed project will replace aging infrastructure assets enhancing the resiliency of the centralized community infrastructure.
  • No comments were received from the public about the project.
  • Mitigation measures required for the project will be implemented through the Environmental Management Plan.

Document Reference Number: 2

Date modified: