Public Comment Period on Intent to Make a Determination
Upgrade Underground Infrastructure Zone, 5th Canadian Division Support Base (CDSB) Gagetown

July 9, 2021 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by July 28, 2021 to:
Allison McCoy, Project Manager
Mailing Address:  Defence Construction Canada, CFB Gagetown, Building B-18
Oromocto, NB, Canada, E2V 4J5
E-mail: Alison.McCoy@forces.gc.ca

The Proposed Project

The Department of National Defence (DND) has proposed a project which involves upgrades to the Water Distribution, and replacement of existing water distribution piping, laterals, valves and appurtenances. Work will also include upgrades to the Sanitary and Storm Collection for pipe, maintenance holes, and catch basins that are in poor condition and will also include hydraulic and special cleaning of sections within the area of work.

Document Reference Number: 1

Date modified: