February 23, 2021 – Indigenous Services Canada must determine whether the proposed Sunchild Culvert 1 Replacement Project located on Sunchild First Nation reserve lands is likely to cause significant adverse environmental effects. To help inform this determination, Indigenous Services Canada is inviting comments from the public respecting that determination.

Written comments must be submitted by March 25, 2021 to:

Stacey LeBlanc
630 Canada Place
9700 Jasper Ave, Edmonton, AB
T5J 4G2
Stacey.leblanc@canada.ca

The Proposed Project

Sunchild First Nation plans to upgrade a watercourse crossing located on an unnamed tributary to the Baptiste River. The proposed project includes the replacement of an existing multiplate culvert (2400mm Ø x 30m length) with an open-bottom arch culvert (8271mm x 3075mm x 25984mm). The roadway in the vicinity of the culvert will also be upgraded.