Environmental Impact Statement - Supporting Information Documents
- Supporting Information Document 1 - Aquatic Resources Baseline Report (Prepared by EcoMetrix Incorporated) [PDF - 128.73 MB]
- Supporting Information Document 2 - Soil Conditions at the Marathon Project Site (Prepared by EcoMetrix Incorporated) [PDF – 11.53 MB]
- Supporting Information Document 3 - Baseline Water Quality Report (Prepared by EcoMetrix Incorporated) [PDF – 10.31 MB]
- Supporting Information Document 4 - Geological Conditions at the Marathon Project Site (Prepared by EcoMetrix Incorporated) [PDF – 6.92 MB]
- Supporting Information Document 7 – Fish Habitat Compensation Strategy (Prepared by EcoMetrix Incorporated) [PDF – 8.46 MB]
- Supporting Information Document 8 – Greenhouse Gas and Climate Change Assessment (Prepared by EcoMetrix Incorporated) [PDF – 3.10 MB]
- Supporting Information Document 9 – Impact Assessment Report – Navigable Waters (Prepared by EcoMetrix Incorporated) [PDF – 20.27 MB]
- Supporting Information Document 10 – Marathon Project - Traffic Impact Study (Prepared by Engineering Northwest Limited Consulting Engineers [PDF – 7.39 MB]
- Supporting Information Document 11- Process Solids Management Facility and Mine Rock Storage Area Alternatives Assessment (Prepared by Knight Piésold Ltd.) [PDF – 65.59 MB]
- Supporting Information Document 12 - Baseline Technical Report - Air (Prepared by True Grit Consulting Limited) [PDF – 17.91MB]
- Supporting Information Document 13 - Baseline Technical Report - Noise (revised on July 23/12 – please see CEAR #233) (Prepared by True Grit Consulting Limited) [PDF – 17.66 MB]
- Supporting Information Document 14 - Baseline Report - Hydrogeology (revised on July 23/12 – please see CEAR #233) (Prepared by True Grit Consulting Limited) [PDF – 28.43 MB]
- Supporting Information Document 15 – Impact Assessment - Hydrogeology (revised on July 23/12 – please see CEAR #233) (Prepared by True Grit Consulting Limited) [PDF – 42.92 MB]
- Supporting Information Document 17 – Impact Assessment Technical Report – Noise (revised on July 23/12 – please see CEAR #233) (Prepared by True Grit Consulting Limited) [PDF – 45.50 MB]
- Supporting Information Document 19 – Worker Health and Safety (Prepared by True Grit Consulting Limited) [PDF – 3.85 MB]
- Supporting Information Document 20 - Baseline Hydrologic Conditions at the Marathon Project Site (Prepared by Calder Engineering) [PDF – 40.94 MB]
- Supporting Information Document 24 - Marathon Project Terrestrial Baseline Environment Program (Prepared by Northern BioScience) [PDF – 7.99 MB]
- Supporting Information Document 27 - A Stage 1 and Stage 2 Archaeological Assessment of Hare Lake and Hare Creek, North of Marathon, McCoy Township, Ontario (Prepared by Ross Archaeological Research Associates) [PDF – 8.39 MB]
- Supporting Information Document 28 - A Stage 1 and Stage 2 Archaeological Assessment of the Marathon PGM Property, North of Marathon, Ontario (Prepared by Woodland Heritage Services Ltd.) [PDF – 5.59 MB]
- Supporting Information Document 29 - Marathon Platinum Group Metals and Copper Mining Project - Baseline Assessment of the Aquatic and Terrestrial Environment (Prepared by Golder Associates) [PDF – 134.61 MB]
- Supporting Information Document 30 - Environmental Baseline Assessment, Marathon Project (Prepared by NAR Environmental Consultants Inc.) [PDF -14.73 MB]
- Supporting Information Document 31 - Technical Report on the Updated Feasibility Study for the Marathon Project, Marathon, Ontario, Canada (Prepared by MICON International Ltd.) [PDF – 11.44 MB]
Document Reference Number: 227