Public Comment Period on Intent to Make a Determination
Replacement of the Fuel Transfer Station and Fuel Tank Systems

June 26, 2020 — The Department of National Defence must decide whether the proposed project is likely to cause significant adverse environmental effects.

To help inform this decision, the Department of National Defence is inviting comments from the public on the project and its potential effects on the environment. All comments received will be considered public. For more information, individuals should consult the Privacy Notice on the Registry website.

Written comments must be submitted by July  16, 2020 to:
Michael Baumann, Master Warrant Officer, Officer Commanding, Real Property Operations Unit (West) Detachment Dundurn
Mailing address: Real Property Operations Section Dundurn, General Delivery Station Main, Dundurn, SK S0K 1K0 
E-mail Address:michael.baumann@forces.gc.ca

The Proposed Project

17 Wing Detachment Dundurn will replace its existing fuel transfer station in the summer of 2020 to address compliance, operational and site deficiencies. The proposed project will consist of constructing a new fuel transfer station as well as decommissioning the existing one. The replacement station will include two aboveground fuel storage tank systems for gasoline and diesel, an access road and product transfer areas. Decommissioning of the current fuel transfer station consists of a gasoline and diesel storage tank systems and the product transfer areas after the new installation.

Document Reference Number: 1

Date modified: